Tender Details

Particulars Details
Title
Shifting/Erection Of Lt Overhead Line For Lighting Purpose With Ixing Of Control Switches Along The Haul Road Of Ob Dumping From P 6 Junction To External Dump P 8 Patch(existing) And External Dump For 10 Year Contract (Under Construction) Vi A Rh Jun
Description
Shifting/Erection Of Lt Overhead Line For Lighting Purpose With Ixing Of Control Switches Along The Haul Road Of Ob Dumping From P 6 Junction To External Dump P 8 Patch(existing) And External Dump For 10 Year Contract (Under Construction) Vi A Rh Jun
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_SECL_313182_1
Reference
Number
SECL/JK/SO(EnM)/eT/24-25/23
Tender Fee 0
EMD 65100
Tender Value -
Place Amadand OCP
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=324570

Start Date July 24, 2024 23:30
End Date
Expired 09/08/2024

Expired 797 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Dismantling and erection of 220v o/h line (coal dump, coal face,haul road,ob dump) at abg colliery

Dismantling and erection of 220v o/h line (coal dump, coal face,haul road,ob dump) at abg colliery

Read more
Proposal for extenion of haul road and ob dump lighting at quarry bed at dbocp.

Proposal for extenion of haul road and ob dump lighting at quarry bed at dbocp.

Read more
Erection of lt overhead line for updating lighting arrangement at departmental working patch, internal ob dumping yard, haul roads and coal stock yard of gondegaon open cast mine

Erection of lt overhead line for updating&#x0d lighting arrangement at departmental working&#x0d patch, internal ob dumping yard, haul roads&#x0d and coal stock yard of gondegaon open cast&#x0d mine

Read more
A)dis.and erection of lt 220v o/h line in diff.location i.e.filter plant,4th patch,ob dump and marian haul road for safety purpose at muraidih(b) dis.and erection of lt 220v o/h line in haul road,ob face,ob dump and ripper face at socp patch,ampc

A)dis.and erection of lt 220v o/h line in diff.location i.e.filter plant,4th patch,ob dump and marian haul road for &#x0d safety purpose at muraidih(b) dis.and erection of lt 220v o/h line in haul road,ob face,ob dump and ripper face at &#x0d socp patch,ampc

Read more
Di of 6.6kv o/h line due to widening and making of new haul road for ob dumping and coal dump and di of 440v o/h line due to coal dump in socp of muraidih, amp colliery

Di of 6.6kv o/h line due to widening and making of new haul road for ob dumping and coal dump and &#x0d di of 440v o/h line due to coal dump in socp of muraidih, amp colliery

Read more
Day to day erection and dismantling of light fittings, overhead conductor and poles at coal face, ob face, haul road,chp/siding coal stock yard, coal transporting road and ob dump yard at locp,ib valley area

Day to day erection and dismantling of light fittings, overhead conductor and poles at coal face, ob face, haul road,chp/siding coal stock yard, coal transporting road and ob dump yard at locp,ib valley area

Read more
Erection/ extension, dismantling and modification of lt oh line (3ph 3 wire) for mine external/internal ob dump, ob face surface miner coal face coal stock yards haul road and mine periphery lighting at kulda ocp, basundhara area

Erection/ extension, dismantling and modification of lt oh line (3ph 3 wire) for mine external/internal ob dump, ob face surface miner coal face coal stock yards haul road and mine periphery lighting at kulda ocp, basundhara area

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise