Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Installation Of Solar Street Light For Rob At Kudiary Near Jatni In Between Station Retanga And Khurda Road On Howarah Madras Main Line.
|
| Description |
Installation Of Solar Street Light For Rob At Kudiary Near Jatni In Between Station Retanga And Khurda Road On Howarah Madras Main Line.
|
| Organisation | Government of Odisha |
| Tender Id | 2023_EICCL_96077_4 |
|
Reference Number |
NIT-25-23-24 |
| Tender Fee | 6000 |
| EMD | 49504 |
| Tender Value | - |
| Place | O/O SE RANDB KHURDA |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in |
| Start Date | October 27, 2023 19:30 |
| End Date |
Expired
06/11/2023
Expired 1077 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Modification in ohe due to construction of 2 lane rob no. 157 by increasing height and rebuilding of old rob at km 83/5-6 between agra fort - idgah stations
Modification in ohe due to construction of 2 lane rob no. 157 by increasing height and rebuilding of old rob at km 83/5-6 between agra fort - idgah stations
Read moreElectrification work of rob at crossing 415a/2e, in between naribari-shivrajpur road near sankargarh railway station in distt prayagraj
Electrification work of rob at crossing 415a/2e, in between naribari-shivrajpur road near sankargarh railway station in distt prayagraj
Read moreProposed construction of rob for elimination of manned lc at lc no. 554 at km 1098/33-35 between chcr (chacher)-sal(salwa) block section.
Proposed construction of rob for elimination of manned lc at lc no. 554 at km 1098/33-35 between chcr (chacher)-sal(salwa) block section.
Read moreTvc division - ohe modification in connection with construction of rob for nhai at km 55/3-4 between alappuzha and tumboli stations and at km 57/13-14 between alappuzha and punnapra stations in ernakulam - kayankulam section
Tvc division - ohe modification in connection with construction of rob for nhai at km 55/3-4 between alappuzha and tumboli stations and at km 57/13-14 between alappuzha and punnapra stations in ernakulam - kayankulam section
Read moreInspection of 01 no. bridge and 04 no. of bow string girder robs of gc section of ddu division using high resolution image &video capture uav drone under sse/br/ddu. (br no.345/dn between station gaya-mpo at km-466/21-467/15, and bow string girder spans of robs (1x60m) between dos-phe at km-556/25-27, rob(1x60m) in bet. station phe-kwd at km-562/11-13, rob(1x60m) phe-kwd at km-564/19-21,rob(1x60m) between kwd-ssm at km-566/19-21).
Inspection of 01 no. bridge and 04 no. of bow string girder robs of gc section of ddu division using high resolution image &video capture uav drone under sse/br/ddu. (br no.345/dn between station gaya-mpo at km-466/21-467/15, and bow string girder spans of robs (1x60m) between dos-phe at km-556/25-27, rob(1x60m) in bet. station phe-kwd at km-562/11-13, rob(1x60m) phe-kwd at km-564/19-21,rob(1x60m) between kwd-ssm at km-566/19-21).
Read moreReconstruction of existing rob no. 108-a at km 43/11-12 between malerkotla and kup railway stations on ludhiana-dhuri- jakhal section for movement of double stack containers
Reconstruction of existing rob no. 108-a at km 43/11-12 between malerkotla and kup railway stations on ludhiana-dhuri- jakhal section for movement of double stack containers
Read moreBengaluru city-jolarpettai-- section: instrumentation of cable stayed bridge (rob no 832a) 1x45m+1x135m at km 341/800-342/000 between krishnarajapuram-whitefield stations. maintenance period is 3 months.
Bengaluru city-jolarpettai-- section: instrumentation of cable stayed bridge (rob no 832a) 1x45m+1x135m at km 341/800-342/000 between krishnarajapuram-whitefield stations. maintenance period is 3 months.
Read moreS&t work inconnection with provision of 2-lane road over bridge (rob) in lieu of lc no: 116 at km: 933/08-10 between gurla-keshorai patan stations .[2026]
S&t work inconnection with provision of 2-lane road over bridge (rob) in lieu of lc no: 116 at km: 933/08-10 between gurla-keshorai patan stations .[2026]
Read moreConstruction of rob in lieu of level crossing no. 229 at km 1324/16-18 in between rpgu-bnar stations in vglj-cnb section & construction of rob in lieu of level crossing no. 367 at km 1126/20-22 at jhansi yard in bina-vglj section in jhansi division of north central railway.
Construction of rob in lieu of level crossing no. 229 at km 1324/16-18 in between rpgu-bnar stations in vglj-cnb section & construction of rob in lieu of level crossing no. 367 at km 1126/20-22 at jhansi yard in bina-vglj section in jhansi division of north central railway.
Read moreConstruction of limited height subway (lhs) in lieu of existing manned level crossings (1)lc no.23 at km 99/18-20 in between hcnr & nkw stations, (2) lc no.14 at km 55/23-25 in between gadh & kdjr stations (3) lc no.08 at km 44/18-16 in between gadh & prnr on jkpr-jrli line and (4) lc no. cp-1 at km 411/15-1 7 in between ctc & kdrp stations on ctc-prdp line of khurda road division. (by air pushing technique)
Construction of limited height subway (lhs) in lieu of existing manned level crossings (1)lc no.23 at km 99/18-20 in between hcnr & nkw stations, (2) lc no.14 at km 55/23-25 in between gadh & kdjr stations (3) lc no.08 at km 44/18-16 in between gadh & prnr on jkpr-jrli line and (4) lc no. cp-1 at km 411/15-1 7 in between ctc & kdrp stations on ctc-prdp line of khurda road division. (by air pushing technique)
Read moreof your Industry type