Tender Details

Particulars Details
Title
Development Work Of Scheme No 08/2023 Road Work Water Supply Sewerage Work Etc Between Ujjain Road And Dewas Bypass In Front Of Mini Super Corridor Dewas
Description
Development Work Of Scheme No 08/2023 Road Work Water Supply Sewerage Work Etc Between Ujjain Road And Dewas By Pass In Front Of Mini Super Corridor Dewas
Organisation Directorate of Town And Country Planning | State Govt. and UT
Tender Id 2024_DTCP_359064_1
Reference
Number
01/2024-25/DVP
Tender Fee 21534
EMD 9.17 Lakh
Tender Value -
Place Dewas
Link
View Original Tender Notice

https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=423175

Start Date July 27, 2024 16:00
End Date
Expired 23/08/2024

Expired 787 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Gauge oil level,lamp assy front fog,pipe brake no 08,weather strip rr window glass lh,micro super filter insert,sealing ring,wood ruff key,lip for compressor lub oil pipe,poly v belt,primary cartridge,filter fluid,hose non metallic,braided hose for exh brake,sub assy of hose water separator,weather strip,water strip door,thermostat water,bulb parking 12v 5w,handle door inside pull,parking light for head lamp 24v 4w,cable assy control

Gauge oil level,lamp assy front fog,pipe brake no 08,weather strip rr window glass lh,micro super filter insert,sealing ring,wood ruff key,lip for compressor lub oil pipe,poly v belt,primary cartridge,filter fluid,hose non metallic,braided hose for exh brake,sub assy of hose water separator,weather strip,water strip door,thermostat water,bulb parking 12v 5w,handle door inside pull,parking light for head lamp 24v 4w,cable assy control

Read more
Construction of cement concrete road under development work of mini super corridor (group 2)

Construction of cement concrete road under development work of mini super corridor (group 2)

Read more
Ie service for construction of 4-lane of dewas-ujjain section of nh752d from design km 0.000 to 19.733 including ujjain bypass from design km 19.733 to 26.900 (parti) and dewas bypass from design km 0.000 to 14.520 (partii) total length of 41.42 km

Ie service for construction of 4-lane of dewas-ujjain section of nh752d from design km 0.000 to 19.733 including ujjain bypass from design km 19.733 to 26.900 (parti) and dewas bypass from design km 0.000 to 14.520 (partii) total length of 41.42 km

Read more
Estimate for rehabilitation of sewerage system by super sucker machine cctv and mini super sucker machine including disposal of silt at various areas of phagwara town distt. kapurthala.

Estimate for rehabilitation of sewerage system by super sucker machine cctv and mini super sucker machine including disposal of silt at various areas of phagwara town distt. kapurthala.

Read more
Project management consultancy services for design and construction of proposed rail over bridge (rob) between railway km 67/10-11 between indore station and dewas railway stations along mr-12 road in tps-08 indore

Project management consultancy services for design and construction of proposed rail over bridge (rob) between railway km 67/10-11 between indore station and dewas railway stations along mr-12 road in tps-08 indore

Read more
Development of internal road (phase-e) with parking facility from in front of between go-down no.- 1 and 8 west side to in front of mini go-downs at sub-market yard, katwa under purba bardhaman zilla regulated market committee.

Development of internal road (phase-e) with parking facility from in front of between go-down no.- 1 and 8 west side to in front of mini go-downs at sub-market yard, katwa under purba bardhaman zilla regulated market committee.

Read more
Annual maintenance of master sewerage scheme in sector-75 to 89 faridabad. construction of 3 nos manhole at 500 mm dia sewerage line between sump well and 7.5 mld stp in front of sector-77 faridabad completed with all respect as per engineer in cha

Annual maintenance of master sewerage scheme in sector-75 to 89 faridabad. construction of 3 nos manhole at 500 mm dia sewerage line between sump well and 7.5 mld stp in front of sector-77 faridabad completed with all respect as per engineer in cha

Read more
Supply and installation 08 mtr mini mast with 5 x 150 w led flood lights at bypass near mulakkada temple, vadakkanal ward in alappuzha municipality under mla - sdf of sri. p. p. chitharanjan mla

Supply and installation 08 mtr mini mast with 5 x 150 w led flood lights at bypass near mulakkada temple, vadakkanal ward in alappuzha municipality under mla - sdf of sri. p. p. chitharanjan mla

Read more
Construction of balance portion of 4 no bypass channel between chainage 12 and 17 for an approximate length of 140 meters along with other associated work at little rangit hydel project under mini micro hydel division, kurseong, dist. darjeeling

Construction of balance portion of 4 no bypass channel between chainage 12 and 17 for an approximate length of 140 meters along with other associated work at little rangit hydel project under mini micro hydel division, kurseong, dist. darjeeling

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise