Tender Details
Particulars | Details |
---|---|
Title |
Job 4 Construction Of Link Road From Main Road Upto Community Centre Ward No 7 In G.P. Heeran Thara Sub Head Providing And Laying Gsb, Wmm, Ss 1 Rs 1 And 30mm Thick Bc At Km 0 00 To 0 400 And C.O Edge Wall Rd 0 050 To 0 093 Under Mmsy
|
Description |
Job 4 Construction Of Link Road From Main Road Upto Community Centre Ward No 7 In G.P. Heeran Thara Sub Head Providing And Laying Gsb, Wmm, Ss 1 Rs 1 And 30mm Thick Bc At Km 0 00 To 0 400 And C.O Edge Wall Rd 0 050 To 0 093 Under Mmsy
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_PWD_87689_1 |
Reference Number |
Job 4 Construction of link road from Main road upto Community Centre ward No-7 in G.P. Heeran Thara |
Tender Fee | 500 |
EMD | 18900 |
Tender Value | |
Place | Una |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=130262 |
Start Date | March 02, 2024 20:30 |
End Date |
07/03/2024 ( Expired 410 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgradation of link road umrali dhilwan heeran thara pubowal to polian via kuthar beet from km 0/00 to 3/400 (sh fc, cd,p/l gsb,wmm,dbm,bc c/o cc pavement, u-shape drain, parapets km 0/0 to 3/400 and road side furniture etc.) under otmnp
Upgradation of link road umrali dhilwan heeran thara pubowal to polian via kuthar beet from km 0/00 to 3/400 (sh fc, cd,p/l gsb,wmm,dbm,bc c/o cc pavement, u-shape drain, parapets km 0/0 to 3/400 and road side furniture etc.) under otmnp
Read moreConstruction of 40 mtr span psct beam bridge over maslana khad on link road jowar maslana jaman kwali via guliar at rd 0/894 ic both side approaches sh const of rwall gsb wmm and bc for approaches under mmgsy
Balance work for construction of 40 mtr span psct beam bridge over maslana khad on link road jowar maslana jaman kwali via guliar at rd 0/894 ic both side approaches sh const of rwall gsb wmm and bc for approaches under mmgsy
Read moreBalance work for the c/o link road from main road upto community centre ward no 7 in g.p. heeran thara
Balance work for the c/o link road from main road upto community centre ward no 7 in g.p. heeran thara
Read morePeriodical maintenance on dehlan to basdehra road km.0.0 to 1.0 and 1/0 to 1.550) (hp1205vr084) ( sh p.l 25 mm thick bc edge lines and cat eyes) under state head
Periodical maintenance on dehlan to basdehra road km.0.0 to 1.0 and 1/0 to 1.550) (hp1205vr084) ( sh p.l 25 mm thick bc edge lines and cat eyes) under state head
Read moreAmp for pmgsy for the year 2025-26 on link road to village balla km 0/0 to 5/0 and jhandutta to behna brahmna road km 0/00 to 5/00 (sh-providing and laying 25 mm thick (bc) bituminious concrete on link road to village balla km 0/0 to 1/0, km 4/00 t
Amp for pmgsy for the year 2025-26 on link road to village balla km 0/0 to 5/0 and jhandutta to behna brahmna road km 0/00 to 5/00 (sh-providing and laying 25 mm thick (bc) bituminious concrete on link road to village balla km 0/0 to 1/0, km 4/00 t
Read moreC/o link road to phc tangling km 0/00 to 1/630 (sub head- p/l g-i, g-ii, g-iii and 20mm thick premix carpet with seal coat at rd 0/00 to 0/390) under badp
C/o link road to phc tangling km 0/00 to 1/630 (sub head- p/l g-i, g-ii, g-iii and 20mm thick premix carpet with seal coat at rd 0/00 to 0/390) under badp
Read moreDeposit-restoration work for laying water supply line jjm at eravathur kochukadavu road from ch.0/000 to 1/980 lhs and valiyaparambu kuzhur road from ch.4/415 to 5/000. lhs and rhs in kuzhur gramapanchayat- restoration work -general civil work
The items included in this estimate are earth work excavation, granular material,gsb,wmm ,ss,rs, bm,spbc&#x0d and bc man mazdoor,road safert etc.
Read moreJob 1 construction of and m.t shaheed amol kalia basti chintpurni to kinnu via raida paida duhal bangwalan road including bridge from km. 0-0 to 9-570 sub head formation cutting, retaining walls, cd works, gsb, wmm, 30mm thick sdbc, c.c. pavement, in
Job 1 construction of and m.t shaheed amol kalia basti chintpurni to kinnu via raida paida duhal bangwalan road including bridge from km. 0-0 to 9-570 sub head formation cutting, retaining walls, cd works, gsb, wmm, 30mm thick sdbc, c.c. pavement, in
Read moreExecution of surfacing work wmm 100/50 mm thick, dbm 50 mm, bc 30mm thick incl edge line marking, prime coat and tack coat on kaying-tato road km 11.350 to 19.950 in the aor of 92 rcc/44tf/project brahmank
Execution of surfacing work wmm 100/50 mm thick, dbm 50 mm, bc 30mm thick incl edge line marking, prime coat and tack coat on kaying-tato road km 11.350 to 19.950 in the aor of 92 rcc/44tf/project brahmank
Read moreConstruction and mt on link road banne di hatti to ghewat bahed road from km. 0-0 to
Construction and mt on link road banne di hatti to ghewat bahed road from km. 0-0 to &#x0d 4-520 sub head balance work of c.o retaining wall, cross drainage work, gsb, wmm, metaling tarring and u-shape drain and crash barriers etc. at various rds under
Read moreof your Industry type