Tender Details

Particulars Details
Title
Job 4 Construction Of Link Road From Main Road Upto Community Centre Ward No 7 In G.P. Heeran Thara Sub Head Providing And Laying Gsb, Wmm, Ss 1 Rs 1 And 30mm Thick Bc At Km 0 00 To 0 400 And C.O Edge Wall Rd 0 050 To 0 093 Under Mmsy
Description
Job 4 Construction Of Link Road From Main Road Upto Community Centre Ward No 7 In G.P. Heeran Thara Sub Head Providing And Laying Gsb, Wmm, Ss 1 Rs 1 And 30mm Thick Bc At Km 0 00 To 0 400 And C.O Edge Wall Rd 0 050 To 0 093 Under Mmsy
Organisation PWD | State Govt. and UT
Tender Id 2024_PWD_87689_1
Reference
Number
Job 4 Construction of link road from Main road upto Community Centre ward No-7 in G.P. Heeran Thara
Tender Fee 500
EMD 18900
Tender Value
Place Una
Link https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=130262
Start Date March 02, 2024 20:30
End Date

07/03/2024 ( Expired 410 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgradation of link road umrali dhilwan heeran thara pubowal to polian via kuthar beet from km 0/00 to 3/400 (sh fc, cd,p/l gsb,wmm,dbm,bc c/o cc pavement, u-shape drain, parapets km 0/0 to 3/400 and road side furniture etc.) under otmnp

Upgradation of link road umrali dhilwan heeran thara pubowal to polian via kuthar beet from km 0/00 to 3/400 (sh fc, cd,p/l gsb,wmm,dbm,bc c/o cc pavement, u-shape drain, parapets km 0/0 to 3/400 and road side furniture etc.) under otmnp

Read more
Construction of 40 mtr span psct beam bridge over maslana khad on link road jowar maslana jaman kwali via guliar at rd 0/894 ic both side approaches sh const of rwall gsb wmm and bc for approaches under mmgsy

Balance work for construction of 40 mtr span psct beam bridge over maslana khad on link road jowar maslana jaman kwali via guliar at rd 0/894 ic both side approaches sh const of rwall gsb wmm and bc for approaches under mmgsy

Read more
Balance work for the c/o link road from main road upto community centre ward no 7 in g.p. heeran thara

Balance work for the c/o link road from main road upto community centre ward no 7 in g.p. heeran thara

Read more
Periodical maintenance on dehlan to basdehra road km.0.0 to 1.0 and 1/0 to 1.550) (hp1205vr084) ( sh p.l 25 mm thick bc edge lines and cat eyes) under state head

Periodical maintenance on dehlan to basdehra road km.0.0 to 1.0 and 1/0 to 1.550) (hp1205vr084) ( sh p.l 25 mm thick bc edge lines and cat eyes) under state head

Read more
Amp for pmgsy for the year 2025-26 on link road to village balla km 0/0 to 5/0 and jhandutta to behna brahmna road km 0/00 to 5/00 (sh-providing and laying 25 mm thick (bc) bituminious concrete on link road to village balla km 0/0 to 1/0, km 4/00 t

Amp for pmgsy for the year 2025-26 on link road to village balla km 0/0 to 5/0 and jhandutta to behna brahmna road km 0/00 to 5/00 (sh-providing and laying 25 mm thick (bc) bituminious concrete on link road to village balla km 0/0 to 1/0, km 4/00 t

Read more
C/o link road to phc tangling km 0/00 to 1/630 (sub head- p/l g-i, g-ii, g-iii and 20mm thick premix carpet with seal coat at rd 0/00 to 0/390) under badp

C/o link road to phc tangling km 0/00 to 1/630 (sub head- p/l g-i, g-ii, g-iii and 20mm thick premix carpet with seal coat at rd 0/00 to 0/390) under badp

Read more
Job 1 construction of and m.t shaheed amol kalia basti chintpurni to kinnu via raida paida duhal bangwalan road including bridge from km. 0-0 to 9-570 sub head formation cutting, retaining walls, cd works, gsb, wmm, 30mm thick sdbc, c.c. pavement, in

Job 1 construction of and m.t shaheed amol kalia basti chintpurni to kinnu via raida paida duhal bangwalan road including bridge from km. 0-0 to 9-570 sub head formation cutting, retaining walls, cd works, gsb, wmm, 30mm thick sdbc, c.c. pavement, in

Read more
Execution of surfacing work wmm 100/50 mm thick, dbm 50 mm, bc 30mm thick incl edge line marking, prime coat and tack coat on kaying-tato road km 11.350 to 19.950 in the aor of 92 rcc/44tf/project brahmank

Execution of surfacing work wmm 100/50 mm thick, dbm 50 mm, bc 30mm thick incl edge line marking, prime coat and tack coat on kaying-tato road km 11.350 to 19.950 in the aor of 92 rcc/44tf/project brahmank

Read more
Construction and mt on link road banne di hatti to ghewat bahed road from km. 0-0 to

Construction and mt on link road banne di hatti to ghewat bahed road from km. 0-0 to &amp#x0d 4-520 sub head balance work of c.o retaining wall, cross drainage work, gsb, wmm, metaling tarring and u-shape drain and crash barriers etc. at various rds under

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise