Tender Details

Particulars Details
Title
Wbmad/Ulb/Rsm/441/24 25
Description
Construction Of Road Length 320 M, Width 4.0 M At Nabagram Boys Club In Ward No.04 And 05 Under Rajpur Sonarpur Municipality
Organisation MUNICIPAL AFFAIRS DEPARTMENT | State Govt. and UT
Tender Id 2024_MAD_771221_1
Reference
Number
WBMAD/ULB/RSM/441/24-25
Tender Fee 0
EMD 9752
Tender Value
Place RAJPUR SONARPUR MUNICIPALITY
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1707689
Start Date November 21, 2024 16:30
End Date

29/11/2024 ( Expired 174 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat

Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat

Read more
Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.

Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more

Supply and installation of submersible pump motor sets at flood affected river bed tubewell with supply of necessary substitutes at different water supply scheme under arsha block under pmd, phe dte. in the district of purulia.

Read more
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh

Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh

Read more
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu

Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise