Particulars | Details |
---|---|
Title |
Mtps I Mill Plant Unit Iv Dismantling Of Seal Air Fan Motor And Overhauling Reassembling Setting The Alignment Of The Motor With Impeller Dismantling Cleaning Of Seal Air Filters And Strengthening Of Seal Air Filter Frame Assembly In The Seal Airline
|
Description |
Mtps I Mill Plant Unit Iv Dismantling Of Seal Air Fan Motor And Overhauling Reassembling Setting The Alignment Of The Motor With Impeller Dismantling Cleaning Of Seal Air Filters And Strengthening Of Seal Air Filter Frame Assembly In The Seal Airline
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_465348_1 |
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT.129/ 2024-25 |
Tender Fee | 0 |
EMD | 1100 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=552986 |
Start Date | July 23, 2024 22:30 |
End Date |
29/07/2024 ( Expired 317 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i mill plant unit i overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during annual over hauling of 2025 26
Mtps i mill plant unit i overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during annual over hauling of 2025 26
Read moreMtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreMtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Mtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Read moreMtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Mtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Read moreMtps i mill plant unit i removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion
Mtps i mill plant unit i removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion
Read moreSupply of air pre heaters seals complete assembly with seal tabs diaphragm seals and holding strips for aph unit i ii and iv 6 items
Supply of air pre heaters seals complete assembly with seal tabs diaphragm seals and holding strips for aph unit i ii and iv 6 items &#x0d
Read moreMtps i tm i unit iii inspection and overhauling of oil vapour extraction fan assembly and soc coolers during 2025 26
Mtps i tm i unit iii inspection and overhauling of oil vapour extraction fan assembly and soc coolers during 2025 26
Read moreMtps i mill plant unit iv hard facing of vertical coal pipe 1mtr length after transition piece 24 nos in mill 4a to mill 4f during capital overhaul 2025 26
Mtps i mill plant unit iv hard facing of vertical coal pipe 1mtr length after transition piece 24 nos in mill 4a to mill 4f during capital overhaul 2025 26
Read moreMtps i mill plant unit iv dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in coal mill 4a to 4f during capital overhaul 2025 26
Mtps i mill plant unit iv dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in coal mill 4a to 4f during capital overhaul 2025 26
Read moreMtps i mp unit iv overhauling of gravimetric feeders and clean out conveyor and cleaning clearing the coal dust and ash deposited from bunker platforms feeder floor feeder discharge platforms coal pipes mill floor and mill gearbox of mill 4a to 4f