Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Mill Plant Unit Ii Dismantling Of Seal Air Fan Motor And Overhauling Reassembling Setting The Alignment Of The Motor With Impeller Dismantling Cleaning Of Seal Air Filters And Strengthening Of Seal Air Filter Frame Assembly
|
Description |
Mtps I Mill Plant Unit Ii Dismantling Of Seal Air Fan Motor And Overhauling Reassembling Setting The Alignment Of The Motor With Impeller Dismantling Cleaning Of Seal Air Filters And Strengthening Of Seal Air Filter Frame Assembly
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_490633_1 |
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT. 212/ 2024-25 |
Tender Fee | 0 |
EMD | 1100 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=582909 |
Start Date | October 04, 2024 00:00 |
End Date |
17/10/2024 ( Expired 235 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Nctps i operation circle ca dn dm and ro plant dismantling the existing wornout line fabrication rubber lining and erection of new msrl pipe bend t piece and reducer in pressure sand filter i ii iii iv and v inlet and outlet connecting pipe lines
Nctps i operation circle ca dn dm and ro plant dismantling the existing wornout line fabrication rubber lining and erection of new msrl pipe bend t piece and reducer in pressure sand filter i ii iii iv and v inlet and outlet connecting pipe lines
Read moreMtps i mill plant unit i overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during annual over hauling of 2025 26
Mtps i mill plant unit i overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during annual over hauling of 2025 26
Read moreMtps i mill plant unit i dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and then assembling the reconditioned bends in an appropriate manner in the coal flow system
Mtps i mill plant unit i dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and then assembling the reconditioned bends in an appropriate manner in the coal flow system
Read moreMtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreMtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Mtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Read moreMtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Mtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Read moreMtps i mill plant unit i removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion
Mtps i mill plant unit i removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion
Read moreMtps i mill plant unit i removal of worn out thinned out wall plates of coal bunkers 1d 1e 1f and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works
Mtps i mill plant unit i removal of worn out thinned out wall plates of coal bunkers 1d 1e 1f and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works
Read moreSupply of air pre heaters seals complete assembly with seal tabs diaphragm seals and holding strips for aph unit i ii and iv 6 items
Supply of air pre heaters seals complete assembly with seal tabs diaphragm seals and holding strips for aph unit i ii and iv 6 items &#x0d
Read moreMtps i bm unit i boiler pressure parts aoh 2025 overhauling of secondary air dampers scanner air fans and its damper flap gate etc
Mtps i bm unit i boiler pressure parts aoh 2025 overhauling of secondary air dampers scanner air fans and its damper flap gate etc
Read moreof your Industry type