Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Lt Line Extension At Gallaiya Tola Andmohadadafai At Ward 6
|
| Description |
Lt Line Extension At Gallaiya Tola Andmohadadafai At Ward 6
|
| Organisation | Directorate Urban Administration and Development | State Govt. and UT |
| Tender Id | 2025_UAD_429463_1 |
|
Reference Number |
378/E-Tender/PWD/BIJURI/2025 |
| Tender Fee | 2295 |
| EMD | 6928 |
| Tender Value | - |
| Place | MUNICIPAL COUNCIL BIJURI DISTT ANUPPUR |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=506273 |
| Start Date | June 09, 2025 15:30 |
| End Date |
Expired
23/06/2025
Expired 457 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreSupply, erection, testing and commissioning of (i) erection of 220kv dc line(37km) from 220/132kv ss sadashivpet to m/s. zaheerabad nimz ltd.(ii) 2nos 220kv bay extensions at 220/132kv ss sadhashivpet and (iii) 2nos 220kv bay extensions and 1no. metering bay at m/s. zaheerabad nimz ltd on turnkey basis.
Supply, erection, testing and commissioning of (i) erection of 220kv dc line(37km) from 220/132kv ss sadashivpet to m/s. zaheerabad nimz ltd.(ii) 2nos 220kv bay extensions at 220/132kv ss sadhashivpet and (iii) 2nos 220kv bay extensions and 1no. metering bay at m/s. zaheerabad nimz ltd on turnkey basis.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreExtension of lt line near samudayikbhawan at khale tola basti ward no 01
Extension of lt line near samudayikbhawan at khale tola basti ward no 01
Read morePalathankuzhy pipe line extension -in ward 6
A n n u a l p l a n - kuz hur gp - 2023 - 24 palathankuzhy pipe line extension -in ward 6-&#x0d general civil work
Read moreEstimate for lt line extension at various location in shankar ward betul
Estimate for lt line extension at various location in shankar ward betul
Read moreWork of lt line pole shifting and line extension in all ward
Work of lt line pole shifting and line extension in all ward of harpalpur as per required.
Read moreInstallation of street light with octagonal pole from bijuri colliery canteen to gallaiya tola railway fatak via minus tiraha at ward no 09
Installation of street light with octagonal pole from bijuri colliery canteen to gallaiya tola railway fatak via minus tiraha at ward no 09
Read moreExtension of ht/lt line at dm coloney
Installation of new 11kv feeder (vip feeder) and extension of ht/lt line i/c construction of 2x200kva sub-station for providing 3phase, 4 wire new service connection to newly constructed vip complex building at dhalabil colony under ed khowai
Read moreLt line extension work at ward no. 21 under nagar palika parishad sidhi
Lt line extension work at ward no. 21 under nagar palika parishad sidhi
Read moreof your Industry type