Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Boundary Pillars In Block Ii Under Rajrappa Project Rajrappa Area
|
| Description |
Construction Of Boundary Pillars In
Block 11 Under Rajrappa Project
Rajrappa Area
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_337434_1 |
|
Reference Number |
CCL/Rajrappa/GM Unit/Civil/NIT/25-26/08 |
| Tender Fee | 0 |
| EMD | 35900 |
| Tender Value | - |
| Place | Rajrappa Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=349799 |
| Start Date | June 14, 2025 16:00 |
| End Date |
Expired
28/06/2025
Expired 452 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Package ii laying of bt and ccroads, construction of storm water drains, minor bridge, ugd lines, cc drains and culverts in adilabad mpty under tufidc
Package ii laying of bt and ccroads, construction of storm water drains, minor bridge, ugd lines, cc drains and culverts in adilabad mpty under tufidc
Read moreSewerage projects in 27 ulbs under sbm 2.0 under jurisdiction of nalgonda and khammam ph divisions (package-ii) under ls contract system with hybrid annuity model
Sewerage projects in 27 ulbs under sbm 2.0 under jurisdiction of nalgonda and khammam ph divisions (package-ii) under ls contract system with hybrid annuity model
Read moreConstruction of cc drains in 30 wards in huzurabad municipality under nagarabhivruddi grants- 5th call
Construction of cc drains in 30 wards in huzurabad municipality under nagarabhivruddi grants- 5th call
Read morePackage iii laying of cc roads, construction of minor bridges, ugd lines, cc drains and culverts in adilabad mpty under tufidc
Package iii laying of cc roads, construction of minor bridges, ugd lines, cc drains and culverts in adilabad mpty under tufidc
Read morePackage v laying of cc roads, construction of cc drains in ward no. 26,27,28,29,30,31,32,33,34,46 and 47 of adilabad municipality under tufidc
Package v laying of cc roads, construction of cc drains in ward no. 26,27,28,29,30,31,32,33,34,46 and 47 of adilabad municipality under tufidc
Read more1) construction of the storm water drain from srisapally cross road, 2) construction of the storm water from prathapa sai reddy garden to gundla cheruvu water way in huzurabad municipality under nagarabhivrudhi funds -6th call
1) construction of the storm water drain from srisapally cross road, 2) construction of the storm water from prathapa sai reddy garden to gundla cheruvu water way in huzurabad municipality under nagarabhivrudhi funds -6th call
Read more1)construction of the storm water drain from agriculture market to saidapur cross road, 2) construction of the storm water from karimnagar road to model cheruvu (via srinagar colony entrance) in huzurabad municipality under nagarabhivrudhi funds - 6th call
1)construction of the storm water drain from agriculture market to saidapur cross road, 2) construction of the storm water from karimnagar road to model cheruvu (via srinagar colony entrance) in huzurabad municipality under nagarabhivrudhi funds - 6th call
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreSupply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreof your Industry type