Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Water Tank And Const. Of Nalla From Gate Of Sen. Sec. School To Play Ground Boundry Wall At Village Guhna.
|
Description |
Construction Of Water Tank And Const. Of Nalla From Gate Of Sen. Sec. School To Play Ground Boundry Wall At Village Guhna
|
Organisation | Government of Haryana |
Tender Id | 2023_HRY_318021_1 |
Reference Number |
2023AC081323 A437 4C63 9328 7815058851F51994DEV |
Tender Fee | 1000 |
EMD | 2500 |
Tender Value | |
Place | SDO PR Kaithal |
Link | https://etenders.hry.nic.in |
Start Date | October 06, 2023 16:30 |
End Date |
16/10/2023 ( Expired 586 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConstruction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Read moreConstruction work of interlocking tiles and drain from manohar lal s house to community toilet in village tiyar jagir. (mlay-nawabganj)
Construction work of interlocking tiles and drain from manohar lal s house to community toilet in village tiyar jagir. (mlay-nawabganj)
Read moreConstruction of flood protection wall, rain water harvesting, ramps at 66kv s/s mahatam nagar under o and m fazilka
Construction of flood protection wall, rain water harvesting, ramps at 66kv s/s mahatam nagar under o and m fazilka
Read moreConstruction of flood protection wall, rain water harvesting, ramps at 66kv s/s sukhewala under o and m division ferozepur
Construction of flood protection wall, rain water harvesting, ramps at 66kv s/s sukhewala under o and m division ferozepur
Read moreSitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of rain water harvesting recharge well along with storage tank and connecting drain at hvdc station alipurduar
Construction of rain water harvesting recharge well along with storage tank and connecting drain at hvdc station alipurduar
Read moreof your Industry type