Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Installation Of One 6inch Dia Ms Pipe Delivery Line (500 M) From 0 D/ 5 L To 7 D/ 2 L, Replacing Old And Damaged Pipeline After Transportation Of Pipe From Surface (After Welding Flanges In Both Side In Surface), For The Pump Of 0 D/ 5 L In Underground At M
|
| Description |
Installation Of One 6inch Dia Ms Pipe Delivery Line (500 M) From 0 D/ 5 L To 7 D/ 2 L, Replacing Old And Damaged Pipeline After Transportation Of Pipe From Surface (After Welding Flanges In Both Side In Surface), For The Pump Of 0 D/ 5 L In Underground At M
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_ECL_342396_1 |
|
Reference Number |
ECL/GM/JNR/EnM/A2/25-26/58 dated 21.08.2025 |
| Tender Fee | 0 |
| EMD | 7000 |
| Tender Value | - |
| Place | JHANJRA UNDERGROUND |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=354937 |
| Start Date | August 29, 2025 16:30 |
| End Date |
Expired
08/09/2025
Expired 405 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Installation of two no 500 gpm 240m head turbine pump at 10l between 0d and 1d after transporting from surface 3d 18l and installation of 2 nos 252m long 6 in pipeline and make necessary fabrication from 0d 10l to 1d 4l boreholes at mic jpc
Installation of two no 500 gpm 240m head turbine pump at 10l between 0d and 1d after transporting from surface 3d 18l and installation of 2 nos 252m long 6 in pipeline and make necessary fabrication from 0d 10l to 1d 4l boreholes at mic jpc
Read moreInstallation of one no turbine pump with motor and er at 1186m sdl section and installation of one no 205m 4in dia ms pipeline(discharge at 0d,r-vi) after transporting from surface and lifting of one no roto pump set(pump motor with baseframe) a
Installation of one no turbine pump with motor and er at 1186m sdl section and installation of one no 205m 4in dia ms pipeline(discharge at 0d,r-vi) after transporting from surface and lifting of one no roto pump set(pump motor with baseframe) a
Read moreof your Industry type