Tender Details
Particulars | Details |
---|---|
Title |
(A) Providing And Fixing Of L.T Control Panel 440 V, 800 A As Secondary Controlling Of 250 Kva, 3.3 Kv/440 V Transformer Installed At Main Sub Station At Gvp Phase Ii Ocp (B) Repairing And Re Winding Of 55 Kw, 440 V Make Wnp For Washing Station And Water S
|
Description |
(A) Providing And Fixing Of L.T Control Panel 440 V, 800 A As Secondary Controlling Of 250 Kva, 3.3 Kv/440 V Transformer Installed At Main Sub Station At Gvp Phase Ii Ocp (B) Repairing And Re Winding Of 55 Kw, 440 V Make Wnp For Washing Station And Water S
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_331464_1 |
Reference Number |
PE(E and M)/GVP Ph-II/E-Tender/2024-25/38 , Dt-06.03.2025 |
Tender Fee | 0 |
EMD | 3600 |
Tender Value | |
Place | Office of the Project Engineer (E and M), GVP Ph-I |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343590 |
Start Date | March 07, 2025 19:30 |
End Date |
19/03/2025 ( Expired 32 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing and re-winding of 325kw, 3.3kv, make-marathan, h.t motor, sl.no.-3f330720/2 of gvp ph-ii ocp
Repairing and re-winding of 325kw, 3.3kv, make-marathan, h.t motor, sl.no.-3f330720/2 of gvp ph-ii ocp
Read more(a). repairing of 3.3kv, 630a, vcb, ctr 600/300/5a, make-pce, sl.no.-05/hmv/132 installed at main sub-station of gvp phase-ii ocp, (b). repairing of 3.3kv vcb, make-pce, 630a, sl.no.-05/hmv/131 of secondary switch at 3mva, 11kv/3.3kv transformer of g
(a). repairing of 3.3kv, 630a, vcb, ctr 600/300/5a, make-pce, sl.no.-05/hmv/132 installed at main sub-station of gvp phase-ii ocp, (b). repairing of 3.3kv vcb, make-pce, 630a, sl.no.-05/hmv/131 of secondary switch at 3mva, 11kv/3.3kv transformer of g
Read moreRepairing of plateform of digtal make 50te capacity, electronic road w/b installed at zero point and check post for monsoon preparation 2025 of gvp phase-ii ocp.
Repairing of plateform of digtal make 50te capacity, electronic road w/b installed at zero point and check post for monsoon preparation 2025 of gvp phase-ii ocp.
Read moreRepairing, maintenance along with providing and fixing of cts, pts, mocbs with maintenance of 33 kv bus-bar system and control relay panel at main sub station of nandira colliery.
Repairing, maintenance along with providing and fixing of cts, pts, mocbs with maintenance of 33 kv bus-bar system and control relay panel at main sub station of nandira colliery.
Read moreRepairing and reconditioning of 11kv vcb make electroteknica s.no. 1735 installed with secondary control of on load isolator and 11kv vcb of make meditron s.no. 9480 installed with primary control of bus bar at main substation of karma ocp .
Repairing and reconditioning of 11kv vcb make electroteknica s.no. 1735 installed with secondary control of on load isolator and 11kv vcb of make meditron s.no. 9480 installed with primary control of bus bar at main substation of karma ocp.
Read moreRepairing rewinding and repairing of one no. 1.25mva 33kv/3.3kv power transformer make andrew yule sl no 12024 installed at rajhara ocp under rajhara area along with providing certificate from nabl regarding high pressure test with dga test of oil
Repairing rewinding and repairing of one no. 1.25mva 33kv/3.3kv power transformer make andrew yule sl no 12024 installed at rajhara ocp under rajhara area along with providing certificate from nabl regarding high pressure test with dga test of oil
Read moreSupply and fixing of ngr 3.3kv 10 amp, 190 ohms for 3 nos., 1 mva, 11kv/3.3kv (2 nos.) and 1.6 mva, 11kv/3.3 kv (01 no.) power transformer installed at main and banwar substation at topa project under kuju area.
Supply and fixing of ngr 3.3kv 10 amp, 190 ohms for 3 nos., 1 mva, 11kv/3.3kv (2 nos.) and 1.6 mva, 11kv/3.3 kv (01 no.) power transformer installed at main and banwar substation at topa project under kuju area.
Read moreInstallation of 10mva, 33kv/11kv transformer, sl. no. ks/1000/23/9, make k sambhav powertronics with differential protection and its accessories at 22.5 mva, 33kv/11kv-3.3kv old sub-station under kdh ocp, nk area
Installation of 10mva, 33kv/11kv transformer, sl. no. ks/1000/23/9, make k sambhav powertronics with differential protection and its accessories at 22.5 mva, 33kv/11kv-3.3kv old sub-station under kdh ocp, nk area
Read more(a)complete repairing and rewinding of 01 no. 315kva, 11kv/440v, si.no. wnp distribution transformer used for power distribution to rawani-tola under kathara colliery, kathara area. (b) complete repairing /rewinding of 01 no. 250kva, 3.3kv/440v trans
(a)complete repairing and rewinding of 01 no. 315kva, 11kv/440v, si.no. wnp distribution transformer used for power distribution to rawani tola under kathara colliery, kathara area. (b) complete repairing /rewinding of 01 no. 250kva, 3.3kv/440v trans
Read moreRepairing and reconditioning of 1 no. 11kv meditron make vcb and 01 no. 3.3kv mineline make vcb installed at main substation and mines of topa ocp under kuju area.
Repairing and reconditioning of 1 no. 11kv meditron make vcb and 01 no. 3.3kv mineline make vcb installed at main substation and mines of topa ocp under kuju area.
Read moreof your Industry type