Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Improvement Works To The Esp Control Room Iii At Nctps I Premises.
|
| Description |
Improvement Works To The Esp Control Room Iii At Nctps I Premises.
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_621092_1 |
|
Reference Number |
CE /NCTPS-I/SE/ CM/101/2025-26 |
| Tender Fee | 0 |
| EMD | 20500 |
| Tender Value | - |
| Place | CE/NCTPS-1 |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=742671 |
| Start Date | November 07, 2025 23:30 |
| End Date |
Expired
24/11/2025
Expired 306 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreImprovement works to the esp control room-i at nctps-i premises
Improvement works to the esp control room-i at nctps-i premises
Read moreProviding water proofing treatment to esp control room i at nctps i premises
Providing water proofing treatment to esp control room i at nctps i premises
Read moreNctps ii civil maintenance circle civil maintenance division providing coping concrete in pipe rack columns from esp i control room to esp ii control room at nctps ii
Nctps ii civil maintenance circle civil maintenance division providing coping concrete in pipe rack columns from esp i control room to esp ii control room at nctps ii
Read moreNctps ii civil maintenance circle civil maintenance division repair and maintenance works to the esp i control building at nctps ii
Nctps ii civil maintenance circle civil maintenance division repair and maintenance works to the esp i control building at nctps ii
Read moreNctps i se mi circle amc 24 25 bm dn unit i ii iii esp attending breakdown works in esp
Nctps i se mi circle amc 24 25 bm dn unit i ii iii esp attending breakdown works in esp for a period of one year from 01 04 2024 to 31 03 2025 or completion of quantity whichever comes earlier from the date of taken over of site
Read moreImprovement works to the junction tower no 52 located at ichs area inside nctps i premises.
Improvement works to the junction tower no 52 located at ichs area inside nctps i premises.
Read moreImprovement works to the junction tower no 51 located at echs area inside nctps i premises
Improvement works to the junction tower no 51 located at echs area inside nctps i premises
Read moreImprovement works to the southern side of secondary crusher house sch building i at ichs area inside nctps i premises
Improvement works to the southern side of secondary crusher house sch building i at ichs area inside nctps i premises
Read moreImprovement and essential repair works to the control room building at sriperumbudur 110 kvss premises
Improvement and essential repair works to the control room building at sriperumbudur 110 kvss premises
Read moreof your Industry type