Tender Details
Particulars | Details |
---|---|
Title |
Dismantling, Laying, Pipe Cutting, Jointing Etc Pipeline Work Of 8 Inch Ms/Gi Pipeline For Pump Shifting At Coal Face, 32 No. Sump Including Repairing Of Old Damaged Delivery Pipelines As When Where Req As Per Advancement Of Mine Under Dakra Ocp
|
Description |
Dismantling, Laying, Pipe Cutting, Jointing Etc Pipeline Work Of 8 Inch Ms/Gi Pipeline For Pump Shifting At Coal Face, 32 No. Sump Including Repairing Of Old Damaged Delivery Pipelines As When Where Req As Per Advancement Of Mine Under Dakra Ocp
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_313513_1 |
Reference Number |
GM (NK)/EnM/e-NIT/2024-25/ 122 |
Tender Fee | 0 |
EMD | 19700 |
Tender Value | |
Place | Dakra Project |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=324890 |
Start Date | July 26, 2024 16:30 |
End Date |
09/08/2024 ( Expired 256 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Shifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of 6 inch dia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area
Shifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of inchdia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area
Read moreDismantling and laying of 250/300mm dia ms pipeline in main sump (turra) and purewa bottom coal face as when required during monsoon 2025 at bina project.
Dismantling and laying of 250/300mm dia ms pipeline in main sump (turra) and purewa bottom coal face as when required during monsoon 2025 at bina project.
Read moreRe-organisation (dismantling, shifting, laying and jointing) of 6 inch dia ms pipeline at mine (r-iv top) under s. b. project.
Re-organisation (dismantling, shifting, laying and jointing) of 6 inch dia ms pipeline at mine (r-iv top) under s. b. project.
Read moreInstallation dismantling shifting of pump motor pontoon starter field switches pipelines (flexible/ms/gi etc) cables hoses along with related accessories and works before and during monsoon as and when required for monsoon 25 at ksl project.
Installation dismantling shifting of pump motor pontoon starter field switches pipelines (flexible/ms/gi etc) cables hoses along with related accessories and works before and during monsoon as and when required for monsoon 25 at ksl project.
Read moreDi and shifting of the digital flowmeter installed at the delivery pipeline of the 2000 gpm pump by dismantling, cutting and laying of 8 inch dia m.s. pipeline, in mine w.r.t. karo ocp, under bnk area
Di and shifting of the digital flowmeter installed at the delivery pipeline of the 2000 gpm pump by dismantling, cutting and laying of 8 inch dia m.s. pipeline, in mine w.r.t. karo ocp, under bnk area
Read moreDismantling and laying for route di of 8 inch dia and 6inch dia gi/ms pipe from tarmi filter plant to tarmi coal stock under tarmi ocp.
Dismantling and laying for route di of 8 inch dia and 6 inch dia gi/ms pipe from tarmi filter plant to tarmi coal stock under tarmi ocp.
Read moreDay to day shifting of 4 inch dia pipeline by dismantling, laying, cutting, jointing (welding) etc as per advancement of mine for firefighting at jamun dohar and repairing of existing pipeline as and when required for a period of one year under kdh
Day to day shifting of 4 inch dia pipeline by dismantling, laying, cutting, jointing (welding) etc as per advancement of mine for firefighting at jamun dohar and repairing of existing pipeline as and when required for a period of one year under kdh
Read moreDismantling, cutting and laying of 8 inch dia m.s. pipeline needed for di of the delivery pipeline of the two nos. of 2000 g.p.m. pump motor sets, in the a patch in mine, suppplying water to the water tanker point, w.r.t. karo ocp, under bnk a
Dismantling, cutting and laying of 8 inch dia m.s. pipeline needed for di of the delivery pipeline of the two nos. of 2000 g.p.m. pump motor sets, in the a patch in mine, suppplying water to the water tanker point, w.r.t. karo ocp, under bnk a
Read moreDay to day works related to transportation, shifting, dismantling, laying, fitting of 4 inch dia. pipelines, valves etc in the mines for firefighting purpose as and when required basis for the period of 365 days as per the direction of engineer in ch
Day to day works related to transportation, shifting, dismantling, laying, fitting of 4 inch dia. pipelines, valves etc in the mines for firefighting purpose as and when required basis for the period of 365 days as per the direction of engineer in ch
Read moreRepairing of leakage in 10/8 inch dia rusted/damaged m.s. pipe line and installed 2000 gpm/150 mtr head pump at dragline coal face sump of abocp mine, block-ii area
Repairing of leakage in 10/8 inch dia rusted/damaged m.s. pipe line and installed 2000 gpm/150 mtr head pump at dragline coal face sump of abocp mine, block-ii area
Read moreof your Industry type