Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling, Laying, Pipe Cutting, Jointing Etc Pipeline Work Of 8 Inch Ms/Gi Pipeline For Pump Shifting At Coal Face, 32 No. Sump Including Repairing Of Old Damaged Delivery Pipelines As When Where Req As Per Advancement Of Mine Under Dakra Ocp
|
| Description |
Dismantling, Laying, Pipe Cutting, Jointing Etc Pipeline Work Of 8 Inch Ms/Gi Pipeline For Pump Shifting At Coal Face, 32 No. Sump Including Repairing Of Old Damaged Delivery Pipelines As When Where Req As Per Advancement Of Mine Under Dakra Ocp
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_313513_1 |
|
Reference Number |
GM (NK)/EnM/e-NIT/2024-25/ 122 |
| Tender Fee | 0 |
| EMD | 19700 |
| Tender Value | - |
| Place | Dakra Project |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=324890 |
| Start Date | July 26, 2024 16:30 |
| End Date |
Expired
09/08/2024
Expired 795 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Work of 8 inch ms/gi pipeline with dismantling, laying, pipe cutting, jointing etc work for pump shifting at coal face as well as 32 no. sump including repairing of old damaged delivery pipelines as when where req as per advancement of mine
Work of 8 inch ms/gi pipeline with dismantling, laying, pipe cutting, jointing etc work for pump shifting at coal face as well as 32 no. sump including repairing of old damaged delivery pipelines as when where req as per advancement of mine
Read moreWork of 8 inch and 6 inch ms/gi pipeline work with dismantling, laying, pipe cutting, jointing, fabrication of bends etc work for pump shifting at coal face as well as 32 no. sump including repairing of old damaged delivery pipelines under dakra ocp
Work of 8 inch and 6 inch ms/gi pipeline work with dismantling, laying, pipe cutting, jointing, fabrication of bends etc work for pump shifting at coal face as well as 32 no. sump including repairing of old damaged delivery pipelines under dakra ocp
Read moreExtension of existing pipeline range and its accessories from 32 no sump to new working coal face for operation of 2000 gpm pump for dewatering of new sump for coal extraction from dakra seam under dakra project
Extension of existing pipeline range and its accessories from 32 no sump to new working coal face for operation of 2000 gpm pump for dewatering of new sump for coal extraction from dakra seam under dakra project
Read more(a)shifting of 4000gpm pump motor set of jharna face sump as and when required(04times)for extraction of coal from the floor of the sump and(b)maintenance of 4000gpm pump of jharna face and purba face and their pipeline of muraidih, amp colliery
(a)shifting of 4000gpm pump motor set of jharna face sump as and when required(04times)for extraction of coal from the floor of the sump and(b)maintenance of 4000gpm pump of jharna face and purba face and their pipeline of muraidih, amp colliery
Read more(a) installation of 4000gpm pump motor in sadbhavna face sump and jointing of its delivery with the existing range and (b) maintenance of 4000gpm pumps of coal face, jharna face and purba face sump under amp colliery.
(a) installation of 4000gpm pump motor in sadbhavna face sump and jointing of its delivery with the existing 
 range and (b) maintenance of 4000gpm pumps of coal face, jharna face and purba face sump under amp colliery.
Read moreDismantling, loading, unloading, shifting and jointing work of various dia ms pipeline for discharge of water from main sump/coal face sump and for day to day requirement at amg. yekona ocm.
Dismantling, loading, unloading, shifting and jointing work of various dia ms pipeline for discharge of water from main sump/coal face sump and for day to day requirement at amg. yekona ocm
Read moreDismantling and laying of 250/300mm diameter ms pipeline in main sump turra and purewa bottom coal face for 730 days as when required at bina project.
Dismantling and laying of 250/300mm diameter ms pipeline in main sump turra and purewa bottom coal face for 730 days as when required at bina project.
Read moreDismantling and laying of 250/300mm dia ms pipeline in main sump (turra) and purewa bottom coal face as when required during monsoon 2025 at bina project.
Dismantling and laying of 250/300mm dia ms pipeline in main sump (turra) and purewa bottom coal face as when required during monsoon 2025 at bina project.
Read moreExtension of existing 90 dn of pe-100, pn-8 hdpe pipe for firefighting arrangement for mine advancement at working face for hemms under dakra project, nk area
Extension of existing 90 dn of pe-100, pn-8 hdpe pipe for firefighting arrangement for mine advancement at working face for hemms under dakra project, nk area
Read moreProviding and fixing of ml6 contactor for operation of submersible pump at coal face sump under dakra project, n k area.
Providing and fixing of ml6 contactor for operation of submersible pump at coal face sump under dakra project, n k area.
Read moreof your Industry type