Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Remodeling Of Head Work At Lakjung Thang Irrigation Canal (Under District Plan)
|
| Description |
Remodeling Of Head Work At Lakjung Thang Irrigation Canal (Under District Plan)
|
| Organisation | Union Territory of Ladakh |
| Tender Id | 2024_PWD_12281_1 |
|
Reference Number |
75 of I and FC Division Leh 2023-24 |
| Tender Fee | 2000 |
| EMD | 1 Lakh |
| Tender Value | - |
| Place | Executive Engineer I and F C Division Leh |
| Link |
View Original Tender Notice
https://tenders.ladakh.gov.in |
| Start Date | January 08, 2024 23:30 |
| End Date |
Expired
27/01/2024
Expired 972 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreRemodelling of headwork lakjung thang irrigation canal.(under capex)
Remodelling of headwork lakjung thang irrigation canal.(under capex)
Read moreRemodeling of head work shey zamindari khul (under district plan)
Remodeling of head work shey zamindari khul (under district plan)
Read moreFlood protection work from ronjuk to lakjung (under district plan)
Flood protection work from ronjuk to lakjung (under district plan)
Read moreFlood protection from ronjuk to lakjung left side.(under district plan)
Flood protection from ronjuk to lakjung left side.(under district plan)
Read moreConstruction of link road at gompa thang via gongma thang. under district. plan
Construction of link road at gompa thang via gongma thang. under district. plan
Read moreIrrigation canal head way zing kongma(under district plan)
Irrigation canal head way zing kongma(under district plan)
Read moreStrengthening chotar irrigation canal from head work to main road alchi.(under district plan)
Strengthening chotar irrigation canal from head work to main road alchi.(under district plan)
Read moreGeneral-plan cheramangalam scheme 2025-26-improvements and urgent rectification work to canal shutters erakkulam branch canal 1st reach main canal shutters vadakketara branch head regutator main canal tailend shutter.-general mechanical work
General-plan cheramangalam scheme&#x0d 2025-26-improvements and urgent rectification&#x0d work to canal shutters erakkulam branch canal&#x0d 1st reach main canal shutters vadakketara&#x0d branch head regutator main canal tailend&#x0d shutter.-general mechanical work
Read moreAction plan _non plan 2025_2026_pyip_urgent repair work of under tunnel in main canal ch. 34_100km at kadoor_general civil work
Action plan _non plan 2025_2026_pyip_urgent repair work of under tunnel in main canal ch. 34_100km at kadoor_general civil work
Read moreof your Industry type