Tender Details

Particulars Details
Title
Silt Clearence And Bed Berm Scraping On Kadaja Mr From Km 0.000 To 0.290 And Km 1.000 To Km 3.000
Description
Silt Clearence And Bed Berm Scraping On Kadaja Mr From Km 0.000 To 0.290 And Km 1.000 To Km 3.000
Organisation Government of Uttar Pradesh
Tender Id 2023_UPIDC_851621_152
Reference
Number
01/EE/2023-24
Tender Fee 559
EMD 1000
Tender Value
Place EXCUTIVE ENGINEER SARYU NAHAR KHAND-4,BASTI
Link
View Original Tender Notice

https://etender.up.nic.in

Start Date October 25, 2023 15:30
End Date
Expired 31/10/2023

Expired 968 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of chebri to nagalani road km 0.000 to 3.000 hp09830

Construction of chebri to nagalani road km 0.000 to 3.000 hp09830

Read more
Internal clearance of kadma minor from km 0.000 to 3.825 (tail)

Internal clearance of kadma minor from km 0.000 to 3.825 (tail)

Read more
Internal clearance of dhanasari minor from km 0.000 to 2.840 (retender).

Internal clearance of dhanasari minor from km 0.000 to 2.840 (retender).

Read more
Internal clearance of satnali disty. from km 0.000 to 10.044 (tail)

Internal clearance of satnali disty. from km 0.000 to 10.044 (tail)

Read more
Work on nh-415 from km 29.500 to km 51.740

Stmc work on nh-415 from km 29.500 to km 51.740

Read more
Supervision consultancy services for existing nh-312 of janipur to bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of wb

Supervision consultancy services for existing nh-312 of janipur-omarpur-krishnagar-bongaon-bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of west bengal

Read more
Four laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement

Four laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement

Read more
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.

Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313

Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise