Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Day To Day Works Of Shifting Of Pump Motor Sets, Extension/ Shifting Of Pipelines, Laying And Jointing Of Pipelines And Other Associated Works At Old Dipka Quarry On As And When Required Basis For A Period Of One Year At Dipka Expansion Project.
|
| Description |
Day To Day Works Of Shifting Of Pump Motor Sets, Extension/ Shifting Of Pipelines, Laying And Jointing Of Pipelines And Other Associated Works At Old Dipka Quarry On As And When Required Basis For A Period Of One Year At Dipka Expansion Project.
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_SECL_304521_1 |
|
Reference Number |
SECL/GM/DA/SO(EnM)/ e-tender/23-24/58 dtd-09/03/24 |
| Tender Fee | 0 |
| EMD | 34500 |
| Tender Value | - |
| Place | Dipka Expansion Project, Dipka Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=315494 |
| Start Date | March 12, 2024 15:30 |
| End Date |
Expired
23/03/2024
Expired 881 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supplying all materials at site including pipes, specials, labors, tools and tackles etc. for laying and jointing of ms pipe for conveying main as per latest is specification. lowering of ms pipes and specials in trenches up to a depth of 3 m below gl. laying and jointing the same inside the trench/ over the ground by means of electric arch welding (spirally welded) using standard electrodes as per latest is specification including earth work in excavation in all kind of soil so as to give one m
Supplying all materials at site including pipes, specials, labors, tools and tackles etc. for laying and jointing of ms pipe for conveying main as per latest is specification. lowering of ms pipes and specials in trenches up to a depth of 3 m below gl. laying and jointing the same inside the trench/ over the ground by means of electric arch welding (spirally welded) using standard electrodes as per latest is specification including earth work in excavation in all kind of soil so as to give one meter average cover over the pipe with disposal of excavated earth within initial lead and lift with disinfection of pipes, testing of pipes against 60 m water head etc. to protect against corrosion pipes are given epoxy lining or hot applied coal tar/ asphalt lining or rich cement mortar lining at works or in the field by the centrifugal process. the outer coating for pipe may be in cement sand guniting or hot applied coal- tar asphaltic enamel reinforced with fibre glass fabric yarn as per cpheeo manual of water supply and treatment all complete job as per standard specification. 600 mm dia (minimum thickness- 6.40 mm)
Read moreDay-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related at old dipka quarry sump on as and when required basis for a period of one year at dep.
Day-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related at old dipka quarry sump on as and when required basis for a period of one year at dep.
Read moreDay-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works at lower kusmunda-1 (lk-1) quarry on as and when required basis for a period of one year at dep.
Day-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works at lower kusmunda-1 (lk-1) quarry on as and when required basis for a period of one year at dep.
Read moreDay-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related to (lk-2e and lk-2w) quarry sump on as and when required basis for a period of one year at dep.
Day-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related to (lk-2e and lk-2w) quarry sump on as and when required basis for a period of one year at dep.
Read moreAssistance in day-to-day activities related to surface pumping including shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works for a period of 365 days at dipka expansion project.
Assistance in day-to-day activities related to surface pumping including shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works for a period of 365 days at dipka expansion project.
Read moreDay-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related at lower kusmunda-2 quarry sump on as and when required basis for a period of one year at dep.
Day-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related at lower kusmunda-2 quarry sump on as and when required basis for a period of one year at dep.
Read moreDay-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related at lower kusmunda-1 (lk-1) quarry sump on as and when required basis for a period of one year.
Day-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related at lower kusmunda-1 (lk-1) quarry sump on as and when required basis for a period of one year.
Read moreAssistance in shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related to day to day activities at lk-1 and old dipka sump quarry for a period of 180 days at dep.
Assistance in shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related to day to day activities at lk-1 and old dipka sump quarry for a period of 180 days at dep.
Read moreDay-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related to different coal faces at quarry on as and when required basis for a period of 365 days at dep.
Day-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related to different coal faces at quarry on as and when required basis for a period of 365 days at dep.
Read moreAssistance in day-to-day activities related to surface pumping including shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works for a period of 365 days at dipka expansion project.
Assistance in day-to-day activities related to surface pumping including shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works for a period of 365 days at dipka expansion project.
Read moreof your Industry type