Tender Details
Particulars | Details |
---|---|
Title |
Assistance In Day To Day Activities Related To Surface Pumping Including Shifting Of Pump Motor Sets, Extension/ Shifting Of Pipelines, Laying And Jointing Of Pipelines And Other Associated Works For A Period Of 365 Days At Dipka Expansion Project.
|
Description |
Assistance In Day To Day Activities Related To Surface Pumping Including Shifting Of Pump Motor Sets, Extension/ Shifting Of Pipelines, Laying And Jointing Of Pipelines And Other Associated Works For A Period Of 365 Days At Dipka Expansion Project.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_SECL_299220_1 |
Reference Number |
SECL/GM/DA/SO(EnM)/ e-tender/23-24/45 dtd-20/01/24 |
Tender Fee | 0 |
EMD | 40500 |
Tender Value | |
Place | Dipka Expansion Project, Dipka Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=309942 |
Start Date | January 23, 2024 15:30 |
End Date |
03/02/2024 ( Expired 496 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Shifting of ht 2000gpm pump motor in the lower side of the sump due to decreasing of water level and other miscellaneous pumping and pipeline works at old ghutway patch-3 of damoda colliery.
Shifting of ht 2000gpm pump motor in the lower 
 side of the sump due to decreasing of water level and 
 other miscellaneous pumping and pipeline works at 
 old ghutway patch-3 of damoda colliery.
Read moreInstallation of 01 no. pump-motor sets at kcc coal patch along with laying and jointing of pipeline at dipka expansion project.
Installation of 01 no. pump-motor sets at kcc coal patch along with laying and jointing of pipeline at dipka expansion project.
Read moreDismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year
Dismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year
Read more(a)lowering of 02 nos. 4000gpm pump motor of jarlahi sump (b)lowering of 02 nos. pontoon along with their ht pump motor of main patch sump due to decrease of water level (c)other misc. jobs related to pumping and pipe line work under ampc.
(a)lowering of 02 nos. 4000gpm pump motor of jarlahi sump (b)lowering of 02 nos. pontoon along with their ht pump motor of main patch sump due to decrease of water level (c)other misc. jobs related to pumping and pipe line work under ampc.
Read more(a)shifting of 4000 gpm pump motor of sadbhavna sump (b)erection of 10inch dia ms pipeline (2nd range) from the sump to the top bench of 4th patch and other miscellaneous job related with pumping and pipeline works of socp and mocp patch, ampc.
(a)shifting of 4000 gpm pump motor of sadbhavna sump (b)erection of 10inch dia ms pipeline (2nd range) from the sump to the top bench of 4th patch and other miscellaneous job related with pumping and pipeline works of socp and mocp patch, ampc.
Read moreDay to day shifting and installation of pumps at west zone (pnh, sadbhav, old dipka, uk sadbhav) sump as and when required basis in gevra project for a period of 365 days
Day to day shifting and installation of pumps at west zone (pnh, sadbhav, old dipka, uk sadbhav) sump as and when required basis in gevra project for a period of 365 days
Read moreDay to day maintenance of pump motor along with electrical maintenance including operation and maintenance of electrical substation, dg at araksha bhawan (290 days) from 15-06-2025 to 31-03-2026. (1st call)
Day to day maintenance of pump motor along with electrical maintenance including operation and maintenance of electrical substation, dg at araksha bhawan (290 days) from 15-06-2025 to 31-03-2026. (1st call)
Read moreWork contract for cleaning, sweeping of office and assistance in day-to-day office related works of o/o the addl. c.e.(construction) and o/o the s.e(emc)-i and s.e(emc)-ii 2x660mw, sstpp, mppgcl, dongalia for a period of 12 months.
Work contract for cleaning, sweeping of office and assistance in day-to-day office related works of o/o the addl. c.e.(construction) and o/o the s.e(emc)-i and s.e(emc)-ii 2x660mw, sstpp, mppgcl, dongalia for a period of 12 months.
Read moreStrengthening, reconditioning and repairing of old/ used box type pontoons along with reconditioning of steel drum/barrel type pontoons for installation of pump-motor sets at various locations of mines premises of dipka expansion project.
Strengthening, reconditioning and repairing of old/ used box type pontoons along with reconditioning of steel drum/barrel type pontoons for installation of pump-motor sets at various locations of mines premises of dipka expansion project.
Read moreReorganization and rearrangement of pipeline ranges from kcc dumping to godavari camp by laying and jointing of pipeline for dewatering purposes at dipka expansion project.
Reorganization and rearrangement of pipeline ranges from kcc dumping to godavari camp by laying and jointing of pipeline for dewatering purposes at dipka expansion project.
Read moreof your Industry type