Tender Details
Particulars | Details |
---|---|
Title |
Ee/Bul/Mmgsyii/Adb 01/2023 24
|
Description |
Upgradation Of 1.Sh 222 To Dongargaon Road Tq. Chikhali 2.Mdr 29 Eklara To Pandhardeo Road Tq. Chikhali
|
Organisation | Government of Maharashtra |
Tender Id | 2023_MMGSY_917602_1 |
Reference Number |
EE/BUL/ADB/NIT-30/2023-24 |
Tender Fee | 11800 |
EMD | 4.86 Lakh |
Tender Value | |
Place | Office of The SE PMGSY Amravati Region Amravati Se |
Link | https://mahatenders.gov.in |
Start Date | June 24, 2023 17:30 |
End Date |
06/07/2023 ( Expired 678 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreConstruction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Construction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Read moreUpgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Read moreIndependent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode.
Read moreWidening and strengthening of soyala osian road km 0/0 to 51/0 (mdr-384)
Widening and strengthening of soyala osian road km 0/0 to 51/0 (mdr-384)
Read moreWbpwd/pw(r)/sepd/piu-i/nit-08 of 2025-2026,sl-1
Widening and strengthening of ayeshbagh - harirampur road from 0.00 kmp to 17.20 km under murshidabad highway division no. i in the district of murshidabad under ridf xxx. (2nd call)
Read moreUpgradatrion of rural road from sh connection (near green island school) to rabindranagar ward no 6 at hut bay
Upgradation of rural road from sh connection (near green island school) to rabindranagar ward no 6 at hut bay, south andaman under pmgsy-iii, batch-i, 2024-25 (package no an01hb22, length 2.700 km)
Read moreUpgradation of rural road from sh connection (krishna biswas home) to ramkrishnapur dam
Upgradation of rural road from sh connection (krishan biswas home) to ramkrishnapur dam at hut bay, south andaman under pmgsy-iii, batch-i, 2024-25 (package no. an01hb21, length 4.425 km)
Read moreUpgradation of rural road from sh connection (near shree rama temple) to sipu and laxmi priya bazar at hut bay
Upgradation of rural road form sh connection (near shree rama temple) to sipu and laxmi priya bazar at hut bay, south andaman under pmgsy-iii, batch-i, 2024-25 (package no an01hb23, length 1.372 km)
Read moreof your Industry type