Tender Details

Particulars Details
Title
Mosquito Control Measures In Residential And Non Residential Buildings At Urja Nagar And Shakti Nagar Colony Of Gevra Area (For 2 Years)
Description
Mosquito Control Measures In Residential And Non Residential Buildings At Urja Nagar And Shakti Nagar Colony Of Gevra Area (For 2 Years)
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_SECL_318015_1
Reference
Number
SECL/GA/GM(C)/ETN /24-25/90 dtd. 21.09.2024
Tender Fee 0
EMD 61100
Tender Value
Place Gevra Area
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=329631
Start Date September 24, 2024 16:30
End Date

04/10/2024 ( Expired 275 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Supply of threat containment vessel (tcv) at various aai airports

Supply of threat containment vessel (tcv) at various aai airports in india with 03&#x0d years onsite warranty with spares and consumables and provision of inhouse/ call&#x0d basis maintenance for 03 years after completion of warranty period.

Read more
Request for proposal (rfp) for selection of concessionaire for development of plug and play facilities under ppp mode in 50 acres on dbfot basis with a concession period of 45 years in sipcot panapakkam

Request for proposal (rfp) for selection of&amp#x0d concessionaire for development of plug and&amp#x0d play facilities under ppp mode in 50 acres on&amp#x0d dbfot basis with a concession period of 45 years in&amp#x0d sipcot panapakkam

Read more
Consultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63

Consultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63

Read more
Construction of rcc tunnels, precast pedestals for llw pipe line in frfcf and bhavini premises and other associated works at kalpakkam

Construction of rcc tunnels, precast pedestals for llw pipe line in frfcf and bhavini premises and other associated works at kalpakkam

Read more
Operation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).

Operation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).

Read more
Supply and stacking of stone boulder, stone metal chips of various sizes coarse sand, burnt clay bricks and ordinary soil selected earth for maintenance of dcbs at different locations in the aor of 7 inf div under 141 dmc in the state of punjab

Supply and stacking of stone boulder, stone metal chips of various sizes coarse sand, burnt clay bricks and ordinary soil selected earth for maintenance of dcbs at different locations in the aor of 7 inf div under 141 dmc in the state of punjab

Read more

Constn.of 3024 nos. of flats along with other amenities at bijoynagar and &amp#x0d daskeary (j.l.no.-02) mouza in raniganj area, asansol, paschim bardhaman under r.c.f.a. project for rehabilitation. &amp#x0d -for unfinished works of daskeary left side block

Read more
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428

1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428

Read more
Switchyard cement concrete paving works in part portion area (pilot project) for keeping zero growth of weed at pps iii, bawana

Switchyard cement concrete paving works in part portion area (pilot project) for keeping zero growth of weed at pps iii, bawana

Read more
Construction of service road at katulboard from nehru nagar to urla of nh-53 from ch.309.940 to 312.250 on lhs and ch. 309.940 to 311.630 on rhs in the state of chhattisgarh

Construction of service road at katulboard from nehru nagar to urla of nh-53 from ch.309.940 to 312.250 on lhs and ch. 309.940 to 311.630 on rhs in the state of chhattisgarh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise