Tender Details

About Tender

🚂 Procurement Opportunity: Set Of Plug & Socket 20 A, 3 Pin 🔌 The Ministry Of Railways, Under The Central Government, Invites Tenders For The Supply Of A Set Of Plug & Socket 20 A, 3 Pin With Complete Deion And Other Specifications As Detailed In The Tender Document. 📅 Submission Deadline: May 07, 2024, 12:00 Pm Tender Fees: Inr 0 Emd: Inr 0 Interested Vendors Must Submit Their Tenders By The Specified Deadline, Adhering To All The Terms And Conditions Outlined In The Tender Document. Keywords: Ministry Of Railways, Plug & Socket, 20 A, 3 Pin, Tender, Electrical Equipment, Government Procurement, Chennai
Particulars Details
Title
Transformer Oil For Wag 9 And Wap 7 (3 Phase) Locomotives
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 106318707
Reference
Number
08241073
Tender Fee 0
EMD 59610
Tender Value
Place Bhubaneswar
Link https://www.ireps.gov.in/ireps/supply/pdfdocs/022025/106574055/viewNitPdf_4829489.pdf
Start Date January 09, 2025 00:58
End Date

03/02/2025 ( Expired 123 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Phase-2 - driver and final stage amplifiers for 2 sets of

Phase-2 - driver and final stage amplifiers for 2 sets of&#x0d iter icrf sources

Read more
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Read more
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Read more
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Read more
Selection of project management company (pmc) for project management consultancy services (pmcs) and detailed design consultant (ddc) for chennai metro rail phase 1 network capacity enhancement project

Selection of project management company (pmc) for project management consultancy services (pmcs) and detailed design consultant (ddc) for chennai metro rail phase 1 network capacity enhancement project

Read more
Overhauling of medium pressure pumps unit drain tank unit flash tanks hot well cleaning, overhauling of working oil and lub oil coolers of bfps of unit no.3 3x210mw of atps, anpara.

Overhauling of medium pressure pumps unit drain tank unit flash tanks hot well cleaning, overhauling of working oil and lub oil coolers of bfps of unit no.3 3x210mw of atps, anpara.

Read more
Overhauling of condensate extraction pumps weir make and hydraulic coupling voith make for unit 3 of 3x210mw, atps anpara

Overhauling of condensate extraction pumps weir make and hydraulic coupling voith make for unit 3 of 3x210mw, atps anpara

Read more
Supply of topographical equipments for hiu, wrd under airbmp lot 3 supply of waterproof and handheld gps with accessories for hiu, wrd under airbmp

Supply of topographical equipments for hiu, wrd under airbmp&amp#x0d lot 3 supply of waterproof and handheld gps with accessories for hiu, wrd under airbmp

Read more
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Read more
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise