Tender Details

Particulars Details
Title
Renewal With P.C. On Gram Ghonspur To Moh. Nagar Sulra Road In Km 1,2,3(200) In Financial Year Of 2024 25
Description
Renewal With P.C. On Gram Ghonspur To Moh. Nagar Sulra Road In Km 1,2,3(200) In Financial Year Of 2024 25
Organisation Cheif Engineer Bareilly Zone PWD Bareilly | State Govt. and UT
Tender Id 2024_CEBLY_883301_1
Reference
Number
71(16)/Nivida (E.T)/2024 Date 15.01.2024
Tender Fee 944
EMD 2.45 Lakh
Tender Value
Place Budaun
Link
View Original Tender Notice

https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1510947

Start Date January 23, 2024 14:30
End Date
Expired 31/01/2024

Expired 885 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Strengthening peridic renewal and maintenance of existing national highway nh154 from km 100840 to chauntra at km 140625 of pathankot mandi corridor in the state of hp

Strengthening peridic renewal and maintenance of existing national highway nh154 from km 100840 to chauntra at km 140625 of pathankot mandi corridor in the state of hp

Read more
Restoration of rain damages on various road under section diggal sub division ramshehar (sh clearance of road side drain in various km

Restoration of rain damages on various road under section diggal sub division ramshehar (sh clearance of road side drain in various km

Read more
Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp

Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp

Read more
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Constr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh

Constr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Under the mada scheme, a concrete interlocking road with drains is being constructed in the village of gumanpura, from jagdish meena house to laxman bairwa house in the gram panchayat simliya, sultanpur.

Under the mada scheme, a concrete interlocking road with drains is being constructed in the village of gumanpura, from jagdish meena house to laxman bairwa house in the gram panchayat simliya, sultanpur.

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise