Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Procurement Of Lt Three Phase Channel Cross Arm
|
Description |
Procurement Of Lt Three Phase Channel Cross Arm
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 16300 |
Tender Value | |
Place | coimbatore north |
Link |
AAAAAAAAAA Login to view |
Start Date | July 05, 2025 21:30 |
End Date |
19/07/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, installation, testing and commissioning of open loop emv ncmc card and qr code based automatic fare collection (afc) system along with camc for nagpur metro rail project phase-ii
Design, supply, installation, testing and commissioning of open loop emv ncmc card and qr code based automatic fare collection (afc) system along with camc for nagpur metro rail project phase-ii
Read moreSitc for modification/ shifting of works of 11 kv and lt electrical utilities of brpl and dismantling/relocation of high mast and street lights of pwd and other agencies infringing lajpat nagar to saket g block corridor line 11.
Sitc for modification/ shifting of works of 11 kv and lt electrical utilities of brpl and dismantling/relocation of high mast and street lights of pwd and other agencies infringing lajpat nagar to saket g block corridor line 11.
Read morePkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Read moreConstruction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Read moreDetailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Read moreConstruction of tech infra and allied services at bikaner and mffr under ge p bikaner phase ii of ii phases on epc mode
Construction of tech infra and allied services at bikaner and mffr under ge p bikaner phase ii of ii phases on epc mode
Read moreProvision of lean to hangar arm to accommodate technical facility at icgas chennai
Provision of lean to hangar arm to accommodate technical facility at icgas chennai
Read moreLt/b885-078-pm-t-9801/1001 - coke drum replacement, allied modernization and piping works in delayed coker unit of panipat refinery at iocl, panipat
Coke drum replacement, allied modernization and piping works in delayed coker unit of panipat refinery at iocl, panipat
Read moreConsultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read moreSewer rehabilitation of old and deteriorated pipes by trenchless cipp technology for main trunk sewer lines heading towards nandari and salawas stps with three year defect liability period
Sewer rehabilitation of old and deteriorated pipes by trenchless cipp technology for main trunk sewer lines heading towards nandari and salawas stps with three year defect liability period
Read moreof your Industry type