Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rimming Of Existing Vertical Borehole (100 Mm Dia/Nx And 260 M Depth ) To Enhance The Surface Discharge Of Mine Water In Respect Of Dhemomain Incline Colliery
|
| Description |
Rimming Of Existing Vertical Borehole (100 Mm Dia/Nx And 260 M Depth ) To Enhance The Surface Discharge Of Mine Water In Respect Of Dhemomain Incline Colliery
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_ECL_338643_1 |
|
Reference Number |
ECL/SDPA/GM/Sur/e-Tender/2025/ 2393 dt-25.06.2025 |
| Tender Fee | 0 |
| EMD | 6000 |
| Tender Value | - |
| Place | Dhemomain Incline Colliery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=351048 |
| Start Date | July 08, 2025 22:30 |
| End Date |
Expired
18/07/2025
Expired 411 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rimming of existing vertical borehole (100 mm dia/nx and 260 m depth ) to enhance the surface discharge of mine water in respect of dhemomain incline collier
Rimming of existing vertical borehole (100 mm dia/nx and 260 m depth ) to enhance the surface discharge of mine water in respect of dhemomain incline collier
Read moreSupporting by roof bolting along travelling roadway from 2d/56l pump to borehole 9r/53l in borachak (r-viii) seam of dhemomain incline colliery
Supporting by roof bolting along travelling roadway from 2d/56l pump to borehole 9r/53l in borachak (r-viii) seam of dhemomain incline colliery
Read moreDrilling 03 nos of nx size coring borehole for analytical study of coal in comparative manners with respect of barmuri ocp.
Drilling 03 nos of nx size coring borehole for analytical study of coal in comparative manners with respect of barmuri ocp.
Read moreDrilling of 3 nos. of nx size incline upward borehole from rviia to r vil seam for proving upper seam free from water at shyamsundarpur colliery.
Drilling of 3 nos. of nx size incline upward borehole from rviia to r vil
 seam for proving upper seam free from water at shyamsundarpur colliery.
Read moreLaying of hume pipe in the road from balrampur 10 and 12 incline to kumda 7 and 8 incline and platform arround 08 nos borehole discharge points of balrampur 10 and 12 inclines at kumda sub area,bishrampur area.
Laying of hume pipe in the road from balrampur 10 and 12 incline to kumda 7 and 8 incline and platform arround 08 nos borehole discharge points of balrampur 10 and 12 inclines at kumda sub area,bishrampur area.
Read moreRenovation of one no. existing 250mm dia 50mt depth vertical borehole with lifting of 150mm dia damage pipe and lowering new 150mm dia pipe at sankalpa khani incline bunker no 6 of bankola colliery
Renovation of one no. existing 250mm dia 50mt depth vertical borehole with lifting of 150mm dia damage pipe and lowering new 150mm dia pipe at sankalpa khani incline bunker no 6 of bankola colliery
Read moreDrilling of nx-size underground non-coring bore hole up to a depth of average 6.30 meter each bore hole from sp top seam to sp middle seam for parting proves purpose through 27/28th incline of hariajam colliery due to contiguous working development s
Drilling of nx-size underground non-coring bore hole up to a depth of average 6.30 meter each bore hole from sp top seam to sp middle seam for parting proves purpose through 27/28th incline of hariajam colliery due to contiguous working development s
Read moreDrilling of nx-size underground non-coring bore hole up to a depth of average 6.30 meter each bore hole from sp top seam to sp middle seam for parting proves purpose through 27/28th incline of hariajam colliery due to contiguous working development s
Drilling of nx-size underground non-coring bore hole up to a depth of average 6.30 meter each bore hole from sp top seam to sp middle seam for parting proves purpose through 27/28th incline of hariajam colliery due to contiguous working development s
Read moreof your Industry type