Tender Details
Particulars | Details |
---|---|
Title |
Ssi, Design, Drawing And Construction Of 05 Nos Maj Pmt Bridges Of 90 Mtr Span At Km 114.250, 40 Mtr Span At Km 118.240 45 Mtr Span At Km 120.650, 45 Mtr Span At Km 124.400, 50 Mtr Span At Km 125.200 On Basolibani Road Project Sampark In J K On Epc
|
Description |
Ssi, Design, Drawing And Construction Of 05 Nos Maj Pmt Bridges Of 90 Mtr Span At Km 114.250, 40 Mtr Span At Km 118.240 45 Mtr Span At Km 120.650, 45 Mtr Span At Km 124.400, 50 Mtr Span At Km 125.200 On Basolibani Road Project Sampark In J K On Epc
|
Organisation | Defence eProcurement Portal |
Tender Id | 2023_BRO_621170_1 |
Reference Number |
CE(P)SPK/EPC/02/2023-24 |
Tender Fee | 11800 |
EMD | 25.83 Lakh |
Tender Value | |
Place | Chief HQ Project Sampark |
Link | https://defproc.gov.in |
Start Date | October 12, 2023 15:30 |
End Date |
27/10/2023 ( Expired 544 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode
Design and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode
Read moreDesign and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Design and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Read moreConstruction work of 30 mtr span r.c.c. p.s.c girder bridge at km 1 of motor road up to kalagaon on danda lakhound road of i.t. park in raipur constituency of dehradun district under state sector.
Construction work of 30 mtr span r.c.c. p.s.c girder bridge at km 1 of motor road up to kalagaon on danda lakhound road of i.t. park in raipur constituency of dehradun district under state sector.
Read moreUpgradation of road budhal mahoregul from existing chainage km 65.880 to km 86.725 (design chainage km 53.250 to km 88.200 net length 34.950 km package iii to nhdl specification under p sampark in ut of j k on epc mode
Upgradation of road budhal mahoregul from existing chainage km 65.880 to km 86.725 (design chainage km 53.250 to km 88.200 net length 34.950 km package iii to nhdl specification under p sampark in ut of j k on epc mode
Read moreConstruction of 4 nos. bridges at km 47.000 (jhiram nalla), km. 123.000 (kerlapal nalla), km. 127.800 (bodaguda nalla) and km. 137.400 (dubbatota nalla) on nh-30 (old nh-221) jagdalpur-sukma-konta road in the state of chhattisgarh on epc mode.
Construction of 4 nos. bridges at km 47.000 (jhiram nalla), km. 123.000 (kerlapal nalla), km. 127.800 (bodaguda nalla) and km. 137.400 (dubbatota nalla) on nh-30 (old nh-221) jagdalpur-sukma-konta road in the state of chhattisgarh on epc mode.
Read moreConstruction of 5 nos. major bridges at km 88.200 (ful-chhindgarh river), km. 122.600 (malger river), km. 145.000 (penta nalah), km. 163.400 (errabor river) and km. 176.600 (injaram nalah) on nh-30 (old nh-221) jagdalpur-sukma-konta road in the state
Construction of 5 nos. major bridges at km 88.200 (ful-chhindgarh river), km. 122.600 (malger river), km. 145.000 (penta nalah), km. 163.400 (errabor river) and km. 176.600 (injaram nalah) on nh-30 (old nh-221) jagdalpur-sukma-konta road in the state
Read moreDsgn, drwg and constr of pmt brs/mcbc on road mtns under (p) sewak in manipur state. part-a 75 mtr br with steel s/str at km 1.310 (part b) (i-ii) 35 mtr pmt br with psc box girder at km 15.92 and km 18.14 (iii) 40.80 mtr mcbc at km 10.84
Dsgn, drwg and constr of pmt brs/mcbc on road mtns under (p) sewak in manipur state. part-a 75 mtr br with steel s/str at km 1.310 (part b) (i-ii) 35 mtr pmt br with psc box girder at km 15.92 and km 18.14 (iii) 40.80 mtr mcbc at km 10.84
Read moreConstruction and metalling tarring mata chintpurni to amlehar road from km 000 to 9350 sh construction of 14 40 mtr span cc rcc solid slab bridge over dhalwari khad at rd 4 155
Construction and metalling tarring mata chintpurni to amlehar road from km 000 to 9350 sh construction of 14 40 mtr span cc rcc solid slab bridge over dhalwari khad at rd 4 155
Read moreConstr of 30 m single span major pmt br with psc box girder with open fdn including proof checking of design and drawings at km 51.700 on kohima pedi peren road under 89 rcc/15 brtf/project sewak in nagaland state
Constr of 30 m single span major pmt br with psc box girder with open fdn including proof checking of design and drawings at km 51.700 on kohima pedi peren road under 89 rcc/15 brtf/project sewak in nagaland state
Read moreBalance work for construction of 62.00 mtr. span bridge on road nh 244 km 27th rd 300 dansal to assar via lalhote, bulandpur at rd 26/400, package no. jk04-3008b1, pmgsy-iii batch-ii of 2023-24, block-assar, district-doda
Balance work for construction of 62.00 mtr. span bridge on road nh 244 km 27th rd 300 dansal to assar via lalhote, bulandpur at rd 26/400, package no. jk04-3008b1, pmgsy-iii batch-ii of 2023-24, block-assar, district-doda
Read moreof your Industry type