Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Two Rooms (Stick Room And Therapy Room) At Sishu Greh At Rk Mission Road, Birubari, Guwahati, Assam
|
Description |
Construction Of Two Rooms (Stick Room And Therapy Room) At Sishu Greh At Rk Mission Road, Birubari, Guwahati, Assam
|
Organisation | Public Works Building and NH Department | State Govt. and UT |
Tender Id | 2025_PWBNH_44471_1 |
Reference Number |
SE/BII/SISHU_GREH/BIRUBARI |
Tender Fee | 1000 |
EMD | 50000 |
Tender Value | |
Place | BIRUBARI, GUWAHATI, |
Link | https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=70786 |
Start Date | May 26, 2025 20:00 |
End Date |
16/06/2025 ( Expired 3 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of 1.500 km internal road in 13 brtf and allied units on nimmu padam darcha road at km 152.00 under project yojak in ladakh
Construction of 1.500 km internal road in 13 brtf and allied units on nimmu padam darcha road at km 152.00 under project yojak in ladakh
Read moreConstruction of service road at katulboard from nehru nagar to urla of nh-53 from ch.309.940 to 312.250 on lhs and ch. 309.940 to 311.630 on rhs in the state of chhattisgarh
Construction of service road at katulboard from nehru nagar to urla of nh-53 from ch.309.940 to 312.250 on lhs and ch. 309.940 to 311.630 on rhs in the state of chhattisgarh
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreRectification of 01 nos. blackspots (bhutpura) on chittorgarh udaipur section and construction of new 2l elevated ramp at debari interchange on chittorgarh udaipur road section to provide connection from chittorgarh to pindwara
Rectification of 01 nos. blackspots (bhutpura) on chittorgarh udaipur section and construction of new 2l elevated ramp at debari interchange on chittorgarh udaipur road section to provide connection from chittorgarh to pindwara
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Read moreof your Industry type