Tender Details

Particulars Details
Title
M/O Completed Scheme Finishing And Furnishing Vikas Sadan.Sh Replacement Of Existing Ahu And Ducting At Ground Floor Conference Hall And Vc Floor With Cassette Type Unit Of Lg Make.
Description
Sh Replacement Of Existing Ahu And Ducting At Ground Floor Conference Hall And Vc Floor With Cassette Type Unit Of Lg Make.
Organisation Delhi Development Authority | Central Govt. Ministry/Department
Tender Id 2025_DDA_859029_1
Reference
Number
28/EE/ED-11/DDA/2024-25Re-Call
Tender Fee 0
EMD 57116
Tender Value
Place As per Tender Documents
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=903126
Start Date May 06, 2025 18:00
End Date

13/05/2025 ( Expired 45 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Replacing of damaged old false ceiling with new false ceiling along with necessary electrical works in new chemical and biotechnology department building conference hall (5th floor) at nit warangal.

Replacing of damaged old false ceiling with new false ceiling along with necessary electrical works in new chemical and biotechnology department building conference hall (5th floor) at nit warangal.

Read more
Design of 400 kv d/c tower type ad /dead end and adspl (special tower) narrow base with quad bersimis conductor (snow zone) for lilo of existing m/s jsw 400 kv d/c baspa 2 to karcham wangtoo-jhakri tl at t-4 to evacuate power from shongtong hep

Design of 400 kv d/c tower type ad /dead end and adspl (special tower) narrow base with quad bersimis conductor (snow zone) for lilo of existing m/s jsw 400 kv d/c baspa 2 to karcham wangtoo-jhakri tl at t-4 to evacuate power from shongtong hep

Read more
Rewinding and repairing work of stator winding with new coil of insulation class-f with vpi of 290kw, 6.6kv, 1489 rpm (make-marathon) of instrument air compressor motor-1 of unit-i and ii, ctpp (o and m), chhabra.

Rewinding and repairing work of stator winding with new coil of insulation class-f with vpi of 290kw, 6.6kv, 1489 rpm (make-marathon) of instrument air compressor motor-1 of unit-i and ii, ctpp (o and m), chhabra.

Read more
Dnit for o and m repair of ...

O and m repair of pumping machinery, er, panel, sluice valve and nrv, internal and external head work pipe etc. installed on existing water supply scheme khushpura gr., dohkia gr., bodia kamalpur gr. , halluhera at mandia khurd gr. , berli khurd

Read more
Sitc of 9.5tr pac system along with associated electrical works of data center and dismantling of the existing old pac units with buy back option at academic block-a, iit hyderabad

Sitc of 9.5 tr precision air-conditioning (pac) system along with associated electrical works of data center and dismantling of the existing old pac units with buy back option at ground floor, chemical engineering (a) block, iit hyderabad

Read more
M/o completed scheme finishing and furnishing vikas sadan.sh_annual operation and maintenance of all pump sets (i/c water supply, submersible, sewage, dewatering pumps, running maintenance of firefighting pump sets), firefighting and sprinkler system

Sh_annual operation and maintenance of all pump sets (i/c water supply, submersible, sewage, dewatering pumps, running maintenance of firefighting pump sets), firefighting and sprinkler systems, operation and rescue of lifts, and operation of address

Read more
Maintenance of office complex of advocate general at janipur jammu by way of conference hall with maximum seating capacity with the facilities of vc system in three sides and attached with washroom and pantry

Maintenance of office complex of advocate general at janipur jammu by way of conference hall with maximum seating capacity with the facilities of vc system in three sides and attached with washroom and pantry

Read more
State plan-2024-25 - providing separate toilet, restroom and incineration unit for woman in all offices of the ce(cr) office buildingmaintenance of existing toilet at the first floor, the construction of a new toilet at ground floor

State plan-2024-25 - providing separate toilet,&amp#x0d restroom and incineration unit for woman in all&amp#x0d offices of the ce(cr) office buildingmaintenance of existing toilet at the first floor,&amp#x0d the construction of a new toilet at ground floor

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise