Tender Details
Particulars | Details |
---|---|
Title |
6 Construction Work Of Cc Road From Sehban House To Nagina Sharma Farm In Ward No. 5 Babu Genda Singh Nagar.
|
Description |
6 Construction Work Of Cc Road From Sehban House To Nagina Sharma Farm In Ward No. 5 Babu Genda Singh Nagar.
|
Organisation | Directorate of Local Bos UP | State Govt. and UT |
Tender Id | 2025_DOLBU_1022091_1 |
Reference Number |
704/n.p.se/E-N.Su./2024-25 Date 24-03-2025 |
Tender Fee | 4712 |
EMD | 3.99 Lakh |
Tender Value | |
Place | Nagar Panchayat Seorahi, Kushinagar |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1850227 |
Start Date | April 03, 2025 00:00 |
End Date |
08/04/2025 ( Expired 16 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreConsultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Read moreConstruction of water tank, concrete, septic tank, platform near slaughter house at ward no 18 nagar palika barwaha
Construction of water tank, concrete, septic tank, platform near slaughter house at ward no 18 nagar palika barwaha
Read morePreparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Preparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Read moreConstruction work of additional floor at vishnupura community hall in ward no. 37
Construction work of additional floor at vishnupura community hall in ward no. 37
Read moreConstruction of rcc drain at ward no 15 suresh sen to kallu saket house
Construction of rcc drain at ward no 15 suresh sen to kallu saket house
Read moreConstruction of culvert at malhar paltan near salam neta ji house in ward no. 08, indore (forth call)
Construction of culvert at malhar paltan near salam neta ji house in ward no. 08, indore (forth call)&#x0d
Read moreof your Industry type