Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
I/C And Silt Clearance Of New Shamdo Minor, Mohangarh Sub Minor, Kandela, Minor From Rd 0 To Tail For Rabi Season 2025 26
|
| Description |
I/C And Silt Clearance Of New Shamdo Minor, Mohangarh Sub Minor, Kandela, Minor From Rd 0 To Tail For Rabi Season 2025 26
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2025_HRY_489761_1 |
|
Reference Number |
2025AD4AA89B 4FB1 413A 844D 98ED779C8C02163IRR |
| Tender Fee | 1680 |
| EMD | 2760 |
| Tender Value | |
| Place | MOHANGARH ROOPGARH KANDELA |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=567968 |
| Start Date | December 11, 2025 22:30 |
| End Date |
Expired
22/12/2025
Expired 196 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Restoration of rain damages on danoi khood drabil raod km. 0/00 to 18/945 (sh c/o pcc retaining wall from rd. 5/885 to 5/897).
Restoration of rain damages on danoi khood drabil raod km. 0/00 to 18/945 (sh c/o pcc retaining wall from rd. 5/885 to 5/897).
Read moreConstruction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Construction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Read moreConsultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Read moreMaintenance contract for inspection and rectification/ replacement of bearing, grout and bed blocks from jw to dwarka mor (excluding) of line-3 in phase-i section (lot-3).
Maintenance contract for inspection and rectification/ replacement of bearing, grout and bed blocks from jw to dwarka mor (excluding) of line-3 in phase-i section (lot-3).
Read moreConstruction and maintenance of road from l223-tangarbahal to saradhapasi baghajantiasahi road under pmgsy-iv batch-i for the package no.or-17-673 in the district of keonjhar.
Construction and maintenance of road from l223-tangarbahal to saradhapasi baghajantiasahi road under pmgsy-iv batch-i for the package no.or-17-673 in the district of keonjhar.
Read moreHyderabad division: sw(i) sc-mue section: proposed construction of 2 lane rob in lieu of lc no.180 at rly km 422/1-2 of span 1x36.00 m composite girder between dab-bsx stations on mue-sc section of hyb division - deposit work sw(ii) hyb div: sc-mue section: proposed construction of 2 lane rob at rly km 418/0-1 of span 1x36.00 m composite girder between kek- dab stations on mue-sc section on sh/mdr at km 1002.9 at atkur side road bypass near dharmabad-deposit work. - electrical trd arrang
For complete deion and other details, please refer to tender
Read moreI/c, j/c and s/c of new shamdo minor, mohangarh sub minor and kandela minor from rd 0 to tail for kharif 2026
I/c, j/c and s/c of new shamdo minor, mohangarh sub minor and kandela minor from rd 0 to tail for kharif 2026
Read moreI/c and s/c of dhigana minor from rd 0 to tail for rabi season 2025-26
I/c and s/c of dhigana minor from rd 0 to tail for rabi season 2025-26
Read moreInternal clearance of tail minor from rd 0 to 43050 before rabi season 2025-26.
Internal clearance of tail minor from rd 0 to 43050 before rabi season 2025-26.
Read moreInternal clearance of tail minor from rd 0 to 43050 before rabi season 2025-26.
Internal clearance of tail minor from rd 0 to 43050 before rabi season 2025-26.
Read moreof your Industry type