Tender Details

Particulars Details
Title
Improvement Of Water Supply Network In Utorda Village By Laying Of 200mm Di Pipeline From Ambebaug Junction To Molar Junction Via Utorda Railway Gate Utorda In Nuvem Constituency
Description
Improvement Of Water Supply Network In Utorda Village By Laying Of 200mm Di Pipeline From Ambebaug Junction To Molar Junction Via Utorda Railway Gate Utorda In Nuvem Constituency
Organisation PUBLIC WORKS DEPARTMENT | State Govt. and UT
Tender Id 2025_PWD_23229_1
Reference
Number
DDW IV/2062/02/2025-26 line01
Tender Fee 26000
EMD 4.58 Lakh
Tender Value
Place nuvem
Link https://eprocure.goa.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=23658
Start Date June 09, 2025 17:10
End Date

19/06/2025 ( Expired 16 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.

Construction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.

Read more
Providing and laying di pipeline from source no. iii to water treatment plant at sabari - 8000 mtr. sw - consultancy services for conducting eia study and obtaining of forest clearance.

Providing and laying di pipeline from source no. iii to water treatment plant at sabari - 8000 mtr. sw - consultancy services for conducting eia study and obtaining of forest clearance.

Read more
Construction of cc and drain work from ramveer sharma house to the main square via panchayat house in village panchayat sahawar kheda (wazirganj)

Construction of cc and drain work from ramveer sharma house to the main square via panchayat house in village panchayat sahawar kheda (wazirganj)

Read more
One time improvement of nh39 from km 172.900 jotsoma bypass junction to km 185.540 lerie welcome gate length 12.64 km under pwd nh division i kohima in the state of nagaland

One time improvement of nh39 from km 172.900 jotsoma bypass junction to km 185.540 lerie welcome gate length 12.64 km under pwd nh division i kohima in the state of nagaland

Read more
Repair/replacement of water supply pipeline and connected distribution water pipeline network in central amenities, hq cwe, stn hq, mes stafff accn, fd hosp, sf accn and mahar pocket of dipatoli mil stn under ge dipatoli

Repair/replacement of water supply pipeline and connected distribution water pipeline network in central amenities, hq cwe, stn hq, mes stafff accn, fd hosp, sf accn and mahar pocket of dipatoli mil stn under ge dipatoli

Read more
Providing and laying of 110mm od, 90mm od, 75mm od and 63mm od pp-r pipeline from ram nagar water tank to sita nagar main valve, nirmal pan shop to shri. gopal house, shanta ram house to smti. permila devi house in dollygunj..........

Providing and laying of 110mm od, 90mm od, 75mm od and 63mm od pp-r pipeline from ram nagar water tank to sita nagar main valve, nirmal pan shop to shri. gopal house, shanta ram house to smti. permila devi house in dollygunj..........

Read more
Repair/replacement of water supply system and connected distribution water pipeline network in asc bn, offr md accn, div camp, pro unit, training area, transit facilities, inf bde, jakrif and med regt of dipatoli mil stn under ge dipatoli

Repair/replacement of water supply system and connected &#x0d distribution water pipeline network in asc bn, offr md accn, div camp, pro &#x0d unit, training area, transit facilities, inf bde, jakrif and med regt of &#x0d dipatoli mil stn under ge dipatoli

Read more
Repairs to sluice gate and improvement to bandh at ponnir in village santa cruz, in santa cruz constituency.

Repairs to sluice gate and improvement to bandh at ponnir in village santa cruz, in santa cruz constituency.

Read more
Design, engineering, providing, welding, laying/fixing in proper position, testing and commissioning of 630mm diameter hdpe raw water intake pipeline in nigeen lake from ashai bagh bridge up to the sump of pokhribal stage 1st.

Design, engineering, providing, welding, laying/fixing in proper position, testing and commissioning of&amp#x0d 630mm diameter hdpe raw water intake pipeline in nigeen lake from ashai bagh bridge up to the sump&amp#x0d of pokhribal stage 1st.

Read more
Ward-26 construction work of rcc drain from kanjadpur turn to kurmanchalnagar gate no. 01 till the culvert in front of neel kamal room and from khalsa school via mandi till 100 feet square.

Ward-26 construction work of rcc drain from kanjadpur turn to kurmanchalnagar gate no. 01 till the culvert in front of neel kamal room and from khalsa school via mandi till 100 feet square.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise