Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Widening Of Cc Road From Si Office To Bdo Office Main Gate At Altabartala Under Mahishasthali Gp Within Bhagwangola I Development Block (Fund Beup).
|
Description |
Widening Of Cc Road From Si Office To Bdo Office Main Gate At Altabartala Under Mahishasthali Gp Within Bhagwangola I Development Block (Fund Beup).
|
Organisation | Zilla Parishad | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 400 |
EMD | 7000 |
Tender Value | |
Place | WITHIN BHAGWANGOLA-I |
Link |
AAAAAAAAAA Login to view |
Start Date | June 17, 2025 23:30 |
End Date |
24/06/2025 ( 5 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Read moreSpl repair to masonic lodge (lodge no.62) at beacher road under age b/r-i of ge dehradun
Spl repair to masonic lodge (lodge no.62) at beacher road under age b/r-i of ge dehradun
Read moreWidening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreAAAAAAAAAA
Login to viewDevelopment and widening of mahatma gandhi road from charial khal to ashabari more in ward.no-143 and 142 under br-xvi
Read moreCs for dpr for (i) development of gf northern hamirpur bypass of 2l/ps kohli to chilbahal in shimla mataur sec of nh103 (ii) upgrade/develop/widening of 2l/ps to 4l/ps from end of hamirpur bypass chilbahal to bhangbar sec new nh03 n nh303 in hp pkg4
Cs for dpr for (i) development of gf northern hamirpur bypass of 2l/ps kohli to chilbahal in shimla mataur sec of nh103 (ii) upgrade/develop/widening of 2l/ps to 4l/ps from end of hamirpur bypass chilbahal to bhangbar sec new nh03 n nh303 in hp pkg4
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read more(i) spl repair to bldg no p-30m of nai jabalpur under ge (p) no. 1 jabalpur. (ii) addition / alteration and special repair to internal road at sqae(a) and lpr under ge(p) no.1 jabalpur
(i) spl repair to bldg no p-30m of nai jabalpur under ge (p) no. 1 jabalpur. (ii) addition / alteration and special repair to internal road at sqae(a) and lpr under ge(p) no.1 jabalpur
Read moreLaying of paver blocks from mohada dafaai from achhelals house via baigan basti and basor mohalla to st. joseph till the main road of tyagi hotel and naman agency at ward no 6
Laying of paver blocks from mohada dafaai from achhelals house via baigan basti and basor mohalla to st. joseph till the main road of tyagi hotel and naman agency at ward no 6
Read moreof your Industry type