Tender Details
About Tender
🚂 Invitation For Bids: 100 T Rrv Supply And Services 🛠️🚚 The Ministry Of Railways, Central Government, Invites Bids For The Supply, Erection, Commissioning, And Provision Of A 100 T Out Of Rail Cum Road Vehicle (Rrv), As Per The Attached Technical Specifications And Drawings. 📅 Bid Submission Deadline: July 22, 2024, 2:15 Pm The Tender Includes A 2 Year Free Warranty Period, Followed By A 5 Year Comprehensive Maintenance Contract (Camc) To Commence Thereafter. Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 9,82,350. Detailed Tender Documents Are Available For Review And Should Be Adhered To For Submission. Keywords: Rrv, Supply And Services, Ministry Of Railways, Central Government, Tender, Emd, Maintenance ContractParticulars | Details |
---|---|
Title |
Supply, Erection, Commissioning And Proven Out Of Rail Cum Road Vehicle (Rrv) 100 T As Per The Scope Of Technical Specification And Drawings Attached. Along With 5 Years Camc (Camc To Be Started After 2 Years Of Free Warranty Period)
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 106352827 |
Reference Number |
01235416B |
Tender Fee | 0 |
EMD | 9.82 Lakh |
Tender Value | |
Place | Chennai |
Link | https://www.ireps.gov.in/ireps/supply/pdfdocs/072024/106352827/viewNitPdf_4623438.pdf |
Start Date | June 28, 2024 18:39 |
End Date |
22/07/2024 ( Expired 274 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, erection, commissioning and 05 years camc after warranty period of 1.343 mw(ac) grid connected solar roof-top power plant at areas of wcl
Design, supply, erection, commissioning and 05 years camc after warranty period of 01 year of 1.343 mw(ac) grid connected solar roof-top power plant at areas of wcl
Read moreSupply installation testing and commissioning of 3x300 kva 3 phase double con on line ups systems in parallel along with post warranty camc for period of 10 years
Supply installation testing and commissioning of 3x300 kva 3 phase double con on line ups systems in parallel along with post warranty camc for period of 10 years
Read moreSupply, installation, commissioning and prove out of static electronic rail cum road weigh bridge cap 100 mt as per attached technical specification.
For complete deion and other details, please refer to tender
Read moreSupply, installation, testing and commissioning of building management system including building performance management work with 4 years of camc after completion of 2 years of warranty period for nro building
Supply, installation, testing and commissioning of building management system including building performance management work with 4 years of camc after completion of 2 years of warranty period for nro building
Read moreSupply, installation, testing and commissioning of fire detection and alarm system work with 2 years of camc after completion of 2 years of warranty period for nro building
Supply, installation, testing and commissioning of fire detection and alarm system work with 2 years of camc after completion of 2 years of warranty period for nro building
Read moreDesign, manufacture, supply, testing & commissioning of rail inspection vehicle (riv) along with training of indian railway personnel, operation & comprehensive maintenance of machine during warranty period of 24 months after commissioning and post-warranty operation and maintenance for 60 months.
For complete deion and other details, please refer to tender
Read moreProcurement of submersible pump sets along with 5 years cmc after completion of warranty period.
Procurement of submersible pump sets along with 5 years cmc after completion of warranty period.
Read moreSupply, installation, commissioning and training of inductively coupled plasma mass spectrometer (icp-ms) along with spares/consumables for 5 years of trouble free operation as per attached technical specification
Supply, installation, commissioning and training of inductively coupled plasma mass spectrometer (icp-ms) along with spares/consumables for 5 years of trouble free operation as per attached technical specification
Read more1) design, supply of electro-mechanical equipment, pipe fittings, erection, installation, testing and commissioning of sewage treatment plant (capacity: 15 kld) along with warranty & periodic maintenance schedule (pms) as per detailed deion/ specification enclosed in annexure-a 2)comprehensive annual maintenance contract for 05 years as per enclosed in annexure-b (camc)
For complete deion and other details, please refer to tender
Read moreSupply, installation, testing and commissioning of p-6 outdoor display board along with one year warranty period and camc period of 4 years at flower market committee, gazipur
Supply, installation, testing and commissioning of p-6 outdoor display board along with one year warranty period and camc period of 4 years at flower market committee, gazipur
Read moreof your Industry type