Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Foot Track From Rimbick Bazaar To Rimbick Gp Under Rimbick Gp.
|
| Description |
Civil Works
|
| Organisation | GORKHALAND TERRITORIAL ADMINISTRATION | State Govt. and UT |
| Tender Id | 2024_GTA_647911_1 |
|
Reference Number |
5THSFC/RGP/23/24/01 |
| Tender Fee | 1203 |
| EMD | 4811 |
| Tender Value | - |
| Place | RIMBICK |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1396919 |
| Start Date | January 17, 2024 23:30 |
| End Date |
Expired
02/02/2024
Expired 966 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Godavari pushkaralu 2027 construction of a cc road from main ghat to saraswathi ghat with central lighting at kaleshwaram (v) mahadevpur (m) jayashankar bhupalpally district
Godavari pushkaralu 2027 construction of a cc road from main ghat to saraswathi ghat with central lighting at kaleshwaram (v) mahadevpur (m) jayashankar bhupalpally district
Read morePart design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreOperation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreOperation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreConstruction of ttro plant for re-use of treate sewage from 11 mld brah stp for ntpc brah, bihar including 15 years o&m.
Construction of ttro plant for re-use of treate sewage from 11 mld brah stp for ntpc brah, bihar including 15 years o&m.
Read moreStmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreSupply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreof your Industry type