Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
33/2023 24/Edd(s)
|
| Description |
Supply Of Decentralised Material For Installation Of New Vcb Pannel Under 33/11 Kv S/S Sitarganj (Head O And M)
|
| Organisation | MD - UPCL | State Govt. and UT |
| Tender Id | 2024_UPCL3_71010_1 |
|
Reference Number |
33/203-24/EDD(S) |
| Tender Fee | 590 |
| EMD | 18500 |
| Tender Value | - |
| Place | Sitarganj |
| Link |
View Original Tender Notice
https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=85263 |
| Start Date | March 06, 2024 14:30 |
| End Date |
Expired
20/03/2024
Expired 920 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreOperation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreOperation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreStraitening of 33/11 kv s/s under edd-iiird under bp 2023-24
Straitening of 33/11 kv s/s under edd-iiird under bp 2023-24
Read moreStraitening of 33/11 kv s/s under edd-ist under b.p. -2023-24
Straitening of 33/11 kv s/s under edd-ist under b.p. -2023-24
Read moreStraitening of 33/11 kv s/s under edd-iind under b.p. -2023-24
Straitening of 33/11 kv s/s under edd-iind under b.p. -2023-24
Read more22/2023-24/edd(s)
Shifting of lt/ht line and dtr from sitarganj area maharan pratap chowk to amariay chowk, bijti chowk to meena bazar to khatima road and sitarganj main chowk to nakuliya chowk via jailcamp under edd sitarganj
Read more33/2024-25/edd(s)
Replacement of existing damage pvc cable by armored cable under bara saction of edd upcl sitarganj (o and m head).
Read moreof your Industry type