Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Repairing And Reconditioning Of 2000 Gpm, 02 Stage, 540cum, 150 Meter Head Sl. No.17042951/20/02/126071,Flow More Make Pump Of Karma Project Kuju Area.
|
Description |
Repairing And Reconditioning Of 2000 Gpm, 02 Stage, 540cum, 150 Meter Head Sl. No.17042951/20/02/126071,Flow More Make Pump Of Karma Project Kuju Area.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_334400_1 |
Reference Number |
GM (K)/EnM/eTender/25-26/25 |
Tender Fee | 0 |
EMD | 4500 |
Tender Value | |
Place | GM UNIT KUJU |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=346653 |
Start Date | April 23, 2025 00:25 |
End Date |
03/05/2025 ( Expired 56 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing of 6 up3 kirloskar make pumps (sl. no.-bar-02)running at bararee colliery of amal. joyrampur colliery under lodna area
Repairing of 6 up3 kirloskar make pumps (sl. no.-bar-02)running at bararee colliery of amal. joyrampur colliery under lodna area
Read moreRepairing of rotor shaft 180 kw,3.3kv,1490 rpm make alstom sl. no. -18307332 at karma substation under kuju area
Repairing of rotor shaft 180 kw,3.3kv,1490 rpm make alstom sl. no. -18307332 at karma substation under kuju area
Read moreRepairing/ reconditioning of 315kva,3.3kv/550v flp transwitch unit,gec make, sl. no.ct3950/b22522 installed at 10 no. substation of sarubera of sarubera project under kuju area.
Repairing/ reconditioning of 315kva,3.3kv/550v flp transwitch unit,gec make, sl. no.ct3950/b22522 installed at 10 no. substation of sarubera of sarubera project under kuju area.
Read moreRepairing of both side steering cylinder, hoist cylinder, rear and front suspension assy. of komatsu hd465-7e0 dumper sl. no. 10343 deployed at topa ocp, kuju area.
Repairing of both side steering cylinder, hoist cylinder, rear and front suspension assy. of komatsu hd465-7e0 dumper sl. no. 10343 deployed at topa ocp, kuju area.
Read moreComplete repairing and overhauling of 6.6kv/400a h.t. ocb gec make benidih feeder sl. no. m-161 main switch at abocp mine under block-ii area
Complete repairing and overhauling of 6.6kv/400a h.t. ocb gec make benidih feeder sl. no. m-161 main switch at abocp mine under block-ii area
Read more(1) complete repairing/rewinding of 02 nos.transformer (a) 500kva,6.6kv/550-440 volt 3 phase g.e.c make sl.no.22419572 and (b) 750kva,6.6kv/550 volt 3 phase power transformer parsons sl.no.96097 of 4 no,sub-station of akwmc under katras area
(1) complete repairing/rewinding of 02 nos.transformer (a) 500kva,6.6kv/550-440 volt 3 phase g.e.c make sl.no.22419572 and (b) 750kva,6.6kv/550 volt 3 phase power transformer parsons sl.no.96097 of 4 no,sub-station of akwmc under katras area
Read moreComplete repairing and fitting of 75hp, 600gpm kirloskar make pump set, sl. no. wtp/75hp/01 for domestic water supply at bilbera water treatment plant under govindpur
Complete repairing and fitting of 75hp, 600gpm kirloskar make pump set, sl. no. wtp/75hp/01 for domestic water supply at bilbera water treatment plant under govindpur
Read moreRepairing of one no. failed bucket cylinder assembly (rhs) and its both eye applicable to tata hitachi ex1200vd shovel sl. no. oaby000119 deployed at karma ocp, kuju area.
Repairing of one no. failed bucket cylinder assembly (rhs) and its both eye applicable to tata hitachi ex1200vd shovel sl. no. oaby000119 deployed at karma ocp, kuju area.
Read moreComplete rewinding and repairing of 150hp 550v 1486 rpm cg make motor flp sl. no afx81023 of bastacolla colliery under bastacolla area.
Complete rewinding and repairing of 150hp 550v 1486 rpm cg make motor flp sl. no afx81023 of bastacolla colliery under bastacolla area.
Read moreRe-construction of foundation block for laying of foundation plate of hc pump having specification of 35000 gph x 150 meter head and allied works at cps muthi phase ii (unit no. 4).
Re-construction of foundation block for laying of foundation plate of hc pump having specification of 35000 gph x 150 meter head and allied works at cps muthi phase ii (unit no. 4).
Read moreof your Industry type