Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing 2000 Gpm 150 Mtr
|
| Description |
Repairing 2000 Gpm 150 Mtr
Head Pump Make Flowmore
Sl No 17042951/20/07 Of
Birsa Project
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_287903_1 |
|
Reference Number |
PE(EnM)/BIRSA/e Tender/23-24/17 |
| Tender Fee | - |
| EMD | 3200 |
| Tender Value | - |
| Place | OFFICE OF PE(ENM) BIRSA PROJECT |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | September 05, 2023 15:30 |
| End Date |
Expired
18/09/2023
Expired 1103 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreRepairing of 2000 gpm 150
Repairing of 2000 gpm 150 
 meter head pump of birsa 
 project
Read moreRepairing of 2000 gpm, 150 mtr head pump installed at birsa project.
Repairing of 2000 gpm, 150 mtr head pump installed at birsa project.
Read moreA)mechanical repairing of 2000 gpm , 150 mtr head pump make grw sl no
A)mechanical repairing of 2000 gpm , 150 mtr head pump make grw sl no 
 hs2525 along with trial and testing at sump under sayald project.
 b)mechanical repairing of 350 kw motor 3.3 kv three phase induction 
Read moreRepairing of four nos 2000 gpm, 150 mtr head, multistage, m n p pumps assembly
Repairing of four nos 2000 gpm, 150 mtr head, multistage, m n p pumps assembly
Read moreComplete repairing of 2000 gpm pump, double impeller 150 mtr head split casing mnp make at kocp.
Complete repairing of 2000 gpm pump, double impeller 150 mtr head split casing mnp make at kocp.
Read moreComplete repairing/overhauling of 4000 gpm pump,150 mtr. head model 10uph8
For complete repairing/overhauling of 4000 gpm pump,150 mtr. head model 10uph8 make kirlosker sap no.40013477 of nichitpur colliery under sijua area.
Read morePartial repairing of 2000 gpm pump, make flowmore model-2 stage, head 150 mtr under dakra ocp, nk area
Partial repairing of 2000 gpm pump, make flowmore model-2 stage, head 150 mtr under dakra ocp, nk area
Read morePartial repairing of 2000 gpm pump, make flowmore model-2 stage, head 150 mtr under dakra ocp, nk area
Partial repairing of 2000 gpm pump, make flowmore model-2 stage, head 150 mtr under dakra ocp, nk area
Read moreof your Industry type