Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Peripheral Development With Construction Of Lined Channel On Drain No. 8 At Jagannath Vihar, Ouat Farm Rd 0 To 358m.
|
| Description |
Peripheral Development With Construction Of Lined Channel On Drain No. 8 At Jagannath Vihar, Ouat Farm Rd 0 To 358m.
|
| Organisation | Municipal Bos | State Govt. and UT |
| Tender Id | 2025_ORULB_113150_3 |
|
Reference Number |
BMC-EE-Tender Cell-11/2025-26 Dt. 03.05.2025 |
| Tender Fee | 10000 |
| EMD | 5.09 Lakh |
| Tender Value | |
| Place | BMC Area |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=538619 |
| Start Date | May 06, 2025 21:30 |
| End Date |
Expired
21/05/2025
Expired 403 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Desilting of drain from amrit vihar to shalimar palace on main burari road and swaroop nagar road due to sand deposition into pwd drain by djb. (3rd call)
Desilting of drain from amrit vihar to shalimar palace on main burari road and swaroop nagar road due to sand deposition into pwd drain by djb. (3rd call)
Read moreConstruction of skywalk with travelators at anand vihar multimodal hub for seamlessly connectivity between anand vihar railway station to isbt, kuashambi. for complete work details (please refer ifb).
Construction of skywalk with travelators at anand vihar multimodal hub for seamlessly connectivity between anand vihar railway station to isbt, kuashambi. for complete work details (please refer ifb).
Read moreDrilling of 8 inch dia 1 no of borewell for installation of submersible and development of tanker filling point with drainage facilities at 203 army aviation squadron at spituk.
Drilling of 8 inch dia 1 no of borewell for installation of submersible and development of tanker filling point with drainage facilities at 203 army aviation squadron at spituk.
Read moreUnder district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreConstruction of various roads of under pmgsyiv package no gj07p10 total 3 roads, 3.24 km 1 bhanpur primary school app road to kheda faliya rd 2 bhanpur padora falia app rd to patel faliya rd 3 mandor gangardi falia rd to mandor faliyu rd ta dhanpur
Construction of various roads of under pmgsyiv package no gj07p10 total 3 roads, 3.24 km 1 bhanpur primary school app road to kheda faliya rd 2 bhanpur padora falia app rd to patel faliya rd 3 mandor gangardi falia rd to mandor faliyu rd ta dhanpur
Read moreConstruction of drain work at barod town on state highway-70 (bot road) sh
Construction of drain work at barod town on state highway-70 (bot road) sh
Read moreConstruction and maintenance of 3 roads 1 construction of amli approach raod to amali usara faliya rd 2 chharchhoda patel faliya road to chharchhoda kheda faliya rd 3 dahod jesavada dhanpur road to chharchhoda talav faliya rd at garbada dahod
Construction and maintenance of 3 roads 1 construction of amli approach raod to amali usara faliya rd 2 chharchhoda patel faliya road to chharchhoda kheda faliya rd 3 dahod jesavada dhanpur road to chharchhoda talav faliya rd at garbada dahod
Read moreDemolition of old oht at kularai street opposite to pachaiamman kovil in ward no.8
Demolition of old oht at kularai street opposite to pachaiamman kovil in ward no.8
Read morePl bm pc and upgradation of roads with interlocking tiles on berms in ward no 1 to 13
Pl bm pc and upgradation of roads with interlocking tiles on berms in ward no 1 to 13
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreof your Industry type