Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🛣️ Rfp: System Integrator For Etc System Implementation 🚦 The National Highways Authority Of India (Nhai), A Public Sector Undertaking, Is Initiating A Request For Proposal (Rfp) Process To Select A System Integrator For The Implementation And Provision Of Operations And Maintenance (On M) Services Of The Electronic Toll Collection (Etc) System At Toll Plazas On National Highways. 📅 Proposal Submission Deadline: July 22, 2024, 3:00 Pm A Tender Security Amount Of Inr 7,00,000/ Is Required With The Emd Submission. Interested Parties Must Submit Detailed Proposals, Including Technical Capabilities, Implementation Plans, And Financial Bids, To Be Considered For This Significant Infrastructure Project. Keywords: Rfp, System Integrator, Etc System, National Highways Authority Of India, Toll Plazas, Operations And Maintenance, Public Sector Undertaking, Infrastructure Project, Tender SecurityParticulars | Details |
---|---|
Title |
Limited Rfp Selection Of System Integrator To Implement And Provide On M Services Of Etc System At Toll Plazas On National Highways
|
Description |
Limited Rfp Selection Of System Integrator To Implement And Provide On M Services Of Etc System At Toll Plazas On National Highways
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2024_NHAI_199945_1 |
Reference Number |
IHMCL/N-LTE-RFP/ ETC-Imp-O n M/ 2024/05 |
Tender Fee | 0 |
EMD | 7 Lakh |
Tender Value | |
Place | NHAI HQ |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=218870 |
Start Date | July 01, 2024 23:30 |
End Date |
25/07/2024 ( Expired 324 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreConsultancy services for preparation of detailed project report for development of 4lane national highway 128b from ballia (junction on nh31 near teekha) to mau (length 56km) section in uttar pradesh
Consultancy services for preparation of detailed project report for development of 4lane national highway 128b from ballia (junction on nh31 near teekha) to mau (length 56km) section in uttar pradesh
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreSelection of bidder for implementation of automatic fare collection system on design, develop, build, install, maintain, operate and transfer (boot) model for 4 years
Selection of bidder for implementation of automatic fare collection system on design, develop, build, install, maintain, operate and transfer (boot) model for 4 years
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreLand slide mitigation including slope stabilization at km 316.880 to km 317.250 near nigulsari and km 330.350 to km 330.560 near nathpa on nh 05 in the state of himachal pradesh
Land slide mitigation including slope stabilization at km 316.880 to km 317.250 near nigulsari and km 330.350 to km 330.560 near nathpa on nh 05 in the state of himachal pradesh
Read moreof your Industry type