Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Renewal Work Of Pahra Bhagh Link Road
|
| Description |
Renewal Work Of Pahra Bhagh Link Road
|
| Organisation | Chief Engineer PWD Faizabad Zone | State Govt. and UT |
| Tender Id | 2025_CEUFZ_1001302_1 |
|
Reference Number |
114/14A DATE 18-01-2025 |
| Tender Fee | 856 |
| EMD | 1.14 Lakh |
| Tender Value | |
| Place | AMETHI |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1789616 |
| Start Date | February 06, 2025 20:30 |
| End Date |
Expired
14/02/2025
Expired 504 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Renewal of pan no 1 6 and 7 top save and inner shell plate replacement work
Renewal of pan no 1 6 and 7 top save and inner shell plate replacement work
Read moreRepair work of power channel road from mes bridge to fore bay and link road up to fagpur gate by means of premix carpet and bituminous macadam
Repair work of power channel road from mes bridge to fore bay and link road up to fagpur gate by means of premix carpet and bituminous macadam
Read morePreparation of dpr of road and bridge from ahmedabad road (govardhan-vilas) to sector 13-14 link road. 2303
Preparation of dpr of road and bridge from ahmedabad road (govardhan-vilas) to sector 13-14 link road. 2303
Read moreConstruction of missing link road from bhojusar upadhiyan to degan km 0/0 to 9/00
Construction of missing link road from bhojusar upadhiyan to degan km 0/0 to 9/00
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreProvn of chanin link fencing around the bldg no np24 at 12 dogra and other sanction work under ge south udhampur
Provn of chanin link fencing around the bldg no np24 at 12 dogra and other sanction work under ge south udhampur
Read morePeriodical renewal of mdr bharwain chintpurni kandrori damtal road amp for the year 2026 27
Providing and laying bituminous concrete 30mm thickness at km. 88.00 to 89.00 hp0404 mdr 0042155445 and km. 69.00 to 70.00 hp0400 mdr 04215125
Read moreRepair, renewal, painting and polishing of steel/ wooden furniture of otm and md accn at dhq-2 (worli, mumbai)
Repair, renewal, painting and polishing of steel/ wooden furniture of otm and md accn at dhq-2 (worli, mumbai)
Read moreRepair/maint of compound/bdy wall barbed wire chain link fencing area drainage and other misc work at 402 lt/ad bty and amn under ge (i) gos
Repair/maint of compound/bdy wall barbed wire chain link fencing area drainage and other misc work at 402 lt/ad bty and amn under ge (i) gos
Read moreof your Industry type