Tender Details
About Tender
🏢 Procurement Opportunity: Air Cooling System Work For Town Hall 🌬️ The Directorate Of Urban Administration And Development, Under The State Government And Union Territory, Invites Bids For The Installation And Maintenance Of An Air Cooling System At The Town Hall, Municipal Corporation Satna, Madhya Pradesh. 📅 Bid Submission Deadline: April 18, 2024, 5:30 Pm Tender Fee: Inr 5485 Emd: Inr 50000 Interested Bidders Must Possess The Requisite Expertise And Experience In Air Cooling Systems. Proposals Should Include Detailed Technical Specifications, Cost Estimates, And A Timeline For Project Completion. Keywords: Air Cooling System, Town Hall, Maintenance Work, Directorate Urban Administration And Development, State Govt. And Ut, Tender, Bid SubmissionParticulars | Details |
---|---|
Title |
Air Cooling System Work In Town Hall
|
Description |
Air Cooling System Work In Town Hall
|
Organisation | Directorate Urban Administration and Development | State Govt. and UT |
Tender Id | 2024_UAD_346716_1 |
Reference Number |
28/02/Workshop/MC Satna/Dated 16/03/2024 |
Tender Fee | 5485 |
EMD | 50000 |
Tender Value | |
Place | Municipal Corporation Satna (M.P.) |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=407587 |
Start Date | March 28, 2024 23:00 |
End Date |
18/04/2024 ( Expired 401 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work
Procurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreImprovement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreKnpar-14
Licensing of exclusive
 advertising rights in kanpur metro trains of corridor-1 of upmrc network in kanpur as per
 scope of work mentioned in tender
Read moreCustom bid for services - design of iter component cooling water system-2f (ccws-2f) and chilled wa
Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreWork of augmentation of water supply system of cantonment board, morar under amrut 2.0
Work of augmentation of water supply system of cantonment board, morar under amrut 2.0
Read moreEngaging expert for cable jointing work
Engaging expert for cable jointing work including excavation and refilling of earth along with supply of material for rectification of fault in 33 kv and 11 kv xlpe cable and abc cable on as and when required basis for a period of 01 year
Read moreConstruction and development work under cm infra phase 4 in raisen road work, building work, other component
Construction and development work under cm infra phase 4 in raisen road work, building work, other component
Read moreof your Industry type