Tender Details

Particulars Details
Title
Concrete Payment Block Interlocking Work In Compound At Balua Pump Canal Including All Cost Of Material, (Excluding Cement ) Labour, T And P Used, Complete In All Respect As Per Drawing Provided By Department. As Directed By Engineer In Charge.
Description
Concrete Payment Block Interlocking Work In Compound At Balua Pump Canal Including All Cost Of Material, (Excluding Cement ) Labour, T And P Used, Complete In All Respect As Per Drawing Provided By Department. As Directed By Engineer In Charge.
Organisation U P Irrigation Department (Mechanical) | State Govt. and UT
Tender Id 2024_UPIDM_973321_1
Reference
Number
08/EE/MLCD/VNS/2024-25/
Tender Fee 854
EMD 62000
Tender Value
Place Executive Engineer Minor lift canal division vns
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1704561
Start Date November 13, 2024 17:30
End Date

19/11/2024 ( Expired 152 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Investigation and survey on gis basis of the project area including soil investigation engineering design hydraulic and structural as required procurement of all labour and material t and p etc and construction of various components complete

Construction of 0.6 mld stp pumping station conveyance system and other associated sewerage works and drain works in patelpuram gaytri shaktipeeth, gomti nagar vistar sector1 district lucknow up india

Read more
First class brick lining work 1 3 in malokhar minor from 0.470 km to 0.770 km at kunda kala pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directe

First class brick lining work 1 3 in malokhar minor from 0.470 km to 0.770 km at kunda kala pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directe

Read more
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.

Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.

Read more
Strenthaning of uruwa minor by renovation of old brick lining 1 4 c.m. in between 0.000 km to 0.850 km at reruwa pump canal including all cost of material, (excluding cement and brick ) labour, t and p used, complete in all respect as per drawing p

Strenthaning of uruwa minor by renovation of old brick lining 1 4 c.m. in between 0.000 km to 0.850 km at reruwa pump canal including all cost of material, (excluding cement and brick ) labour, t and p used, complete in all respect as per drawing p

Read more
Shifting and tube well pump house boundary wall works other works in itaura buzurg water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after compl

Shifting and tube well pump house boundary wall works other works in itaura buzurg water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after compl

Read more
Shifting of tube well pump house boundary wall works other work in existing water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after completi

Shifting of tube well pump house boundary wall works other work in existing water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after completi

Read more
Strenthaning of main canal by stone boulder piching from 0.400 km to 0.564 km at dhankuwari pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed

Strenthaning of main canal by stone boulder piching from 0.400 km to 0.564 km at dhankuwari pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed

Read more
Laying of interlocking tiles with kerb stone complete with all material labour, t and p (as per specification of boq)

Laying of interlocking tiles with kerb stone complete with all material labour, t and p (as per specification of boq)

Read more
Strenthaning of sobandha left minor from 1.570 km to 2.070 km by brick lining work at sogai pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed

Strenthaning of sobandha left minor from 1.570 km to 2.070 km by brick lining work at sogai pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed

Read more
Bank protection work of river bank from 20.00 m to 40.00 m at sogai pump canal including all cost of material (excluding cement ), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.

Bank protection work of river bank from 20.00 m to 40.00 m at sogai pump canal including all cost of material (excluding cement ), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise