Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of V.R.B. At Chhitauni Pump Canal Including All Cost Of Material (Excluding Cement And Bricks), Labour, T And P Used Complete In All Respects As Per Drawing Provided By Department. As Directed By Engineer In Charge. .
|
| Description |
Construction Of V.R.B. At Chhitauni Pump Canal Including All Cost Of Material (Excluding Cement And Bricks), Labour, T And P Used Complete In All Respects As Per Drawing Provided By Department. As Directed By Engineer In Charge.
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_UPIDM_817732_15 |
|
Reference Number |
07/EE/MLCD/VND/2023-24 |
| Tender Fee | 766 |
| EMD | 7000 |
| Tender Value | - |
| Place | Executive Engineer Minor lift canal division vns |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | September 15, 2023 19:30 |
| End Date |
Expired
21/09/2023
Expired 1119 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Read moreConstruction of v.r.b. at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.
Construction of v.r.b. at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.
Read moreRenovation work of main canal from km. 0.00 to km. 0.800 at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department. as directed by engg.
Renovation work of main canal from km. 0.00 to km. 0.800 at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department. as directed by engg.
Read moreRenovation work of main canal from km. 1.325 to km. 1.475 at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department. as directed by engg.
Renovation work of main canal from km. 1.325 to km. 1.475 at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department. as directed by engg.
Read more1st class brick lining work of chhitauni minor from km. 0.00 to km. 0.300 at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department. as
1st class brick lining work of chhitauni minor from km. 0.00 to km. 0.300 at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department. as
Read more1st class brick lining work of chhitauni minor from km. 0.00 to km. 0.300 at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department.
1st class brick lining work of chhitauni minor from km. 0.00 to km. 0.300 at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department.
Read moreRepaire of ramp and stair case for delivery pipline at chhitauni pump canal including all cost of material (excluding cement and boulder), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer
Repaire of ramp and stair case for delivery pipline at chhitauni pump canal including all cost of material (excluding cement ), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer
Read moreMaking ramp, staire case slope at karauti pump canal including all cost of material (excluding cement), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge..
Making ramp, staire case slope at karauti pump canal including all cost of material (excluding cement), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.
Read moreRepaire of ramp and stair case for delivery pipline at chhitauni pump canal including all cost of material (excluding cement and boulder), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in
Repaire of ramp and stair case for delivery pipline at chhitauni pump canal including all cost of material (excluding cement and boulder), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in
Read moreConstruction of boundry wall at niyardih ii feeder pump canal including all cost of material (excluding cement), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.
Construction of boundry wall at niyardih ii feeder pump canal including all cost of material (excluding cement), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.
Read moreof your Industry type