Costruction Of Ramp And Staire Case At Newajganj East Pump Canal Including All Cost Of Material, (Excluding Cement) Labour, T And P Used, Complete In All Respect As Per Drawing Provided By Department. As Directed By Engineer In Charge.
Description
Costruction Of Ramp And Staire Case At Newajganj East Pump Canal Including All Cost Of Material, (Excluding Cement) Labour, T And P Used, Complete In All Respect As Per Drawing Provided By Department. As Directed By Engineer In Charge.
Organisation U P Irrigation Department (Mechanical) | State Govt. and UT
Tender Id 2023_UPIDM_844870_15
Reference
Number
09/EE/MLCD/VNS/2023-24
Tender Fee 766
EMD 15000
Tender Value -
Place EXECUTIVE ENGINEER MINOR LIFT CANAL DIVISION VARAN
Link
View Original Tender Notice

https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1522001

Start Date February 01, 2024 17:30
End Date
Expired 06/02/2024

Expired 983 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr

Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr

Read more
Costruction oframp and staire case at newajganj east pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by engineer in charge

Costruction oframp and staire case at newajganj east pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by engineer in charge

Read more
Making ramp, staire case slope at karauti pump canal including all cost of material (excluding cement), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge..

Making ramp, staire case slope at karauti pump canal including all cost of material (excluding cement), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.

Read more
Making ramp, staire case and slope at karauti pump canal including all cost of material (excluding cement ), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge

Making ramp, staire case and slope at karauti pump canal including all cost of material (excluding cement ), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge

Read more
Construction of ramp and stair at head of sudav pump canal including all cost of material (excluding cement ), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.

Construction of ramp and stair at head of sudav pump canal including all cost of material (excluding cement ), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.

Read more
Concrete payment block interlocking work in compound at balua pump canal including all cost of material, (excluding cement ) labour, t and p used, complete in all respect as per drawing provided by department. as directed by engineer in charge.

Concrete payment block interlocking work in compound at balua pump canal including all cost of material, (excluding cement ) labour, t and p used, complete in all respect as per drawing provided by department. as directed by engineer in charge.

Read more
Construction of ramp at slope of river bank at naubatpur pump canal including all cost of material (excluding cement ), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.

Construction of ramp at slope of river bank at naubatpur pump canal including all cost of material (excluding cement ), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.

Read more
Construction of ramp and stair at head of baira east pump canal including all cost of material (excluding cement and brick ), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.

Construction of ramp and stair at head of baira east pump canal including all cost of material (excluding cement and brick ), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.

Read more
Construction of v.r.b. at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge. .

Construction of v.r.b. at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.

Read more
Construction of v.r.b. at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.

Construction of v.r.b. at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.

Read more
Click Here to Download Dockets