Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Dismantling, Shifting And Fitting Of Old Motor, Base And Coupling, Fabrication And Erection Of New Motor, Base And Coupling Fitting And Assembling Etc. Of Pump No. 1 And 3 (River Side) Including Making Of Flange As Per Required Under Kathara Washery
|
Description |
Dismantling, Shifting And Fitting Of Old Motor, Base And Coupling, Fabrication And Erection Of New Motor, Base And Coupling Fitting And Assembling Etc. Of Pump No. 1 And 3 (River Side) Including Making Of Flange As Per Required Under Kathara Washery
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 2500 |
Tender Value | |
Place | Kathara Washery |
Link |
AAAAAAAAAA Login to view |
Start Date | June 25, 2025 16:30 |
End Date |
05/07/2025 ( 10 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling, shifting and fitting of old motor, base and coupling, fabrication and erection of new motor, base and coupling fitting and assembling etc. of pump no. 1 and 3 (river side) including making of flange as per required under kathara washery
Dismantling, shifting and fitting of old motor, base and coupling, fabrication and erection of new motor, base and coupling fitting and assembling etc. of pump no. 1 and 3 (river side) including making of flange as per required under kathara washery
Read moreRepair, fabrication and erection of old, worn-out and damaged delivery pipe line from water to 27 meter level in hydro cyclone section of kathara washery
Repair, fabrication and erection of old, worn-out and damaged delivery pipe line from water to 27 meter level in hydro cyclone section of kathara washery
Read moreFabrication and erection of pathway of unit no. 79 and 80 and side guard with channel angle plate etc changing and bressing in raw coal section at kathara washery
Fabrication and erection of pathway of unit no. 79 and 80 and side guard with channel angle plate etc changing and bressing in raw coal section at kathara washery
Read moreFabrication and erection of 471 screens feed collector, pipe line fitting of audco valve, supporting structure etc after complete dismantling the same at 9 meters level and scrap materials removed from working site to scrap yard at fine coal section
Fabrication and erection of 471 screens feed collector, pipe line fitting of audco valve, supporting structure etc after complete dismantling the same at 9 meters level and scrap materials removed from working site to scrap yard at fine coal section
Read moreFabrication and erection of stair and railing its channel, angle and plate etc of screen floor level of section no. 1 in the fine coal section of kathara washery
Fabrication and erection of stair and railing its channel, angle and plate etc of screen floor level of section no. 1 in the fine coal section of kathara washery
Read moreA)fabrication, erection and fitting of unit no. 215 crusher (impact crusher) outer body lining using 10 mm plate, (b)fabrication, erection and fitting of unit no. 215 crusher motor base support using 16 mm plate c)fabrication, erection and fitting of
A)fabrication, erection and fitting of unit no. 215 crusher (impact crusher) outer body lining using 10 mm plate, (b)fabrication, erection and fitting of unit no. 215 crusher motor base support using 16 mm plate c)fabrication, erection and fitting of
Read moreFor dismantling, cutting and transporting of structure(iron)of tippler shed, main haulage etc.at mudidih colliery(ii)and making, fabrication and fitting of pontoon with motor pump and base plate fitting size 21x21 ft
For dismantling, cutting and transporting of structure(iron)of tippler shed, main haulage etc.at mudidih colliery(ii)and making, fabrication and fitting of pontoon with motor pump and base plate fitting size 21x21 ft
Read moreSupplying and laying of 3 g.i pipe medium class and day to day dismantling /laying/fitting etc. 3 and 4 g.i/m.s pipe for the fire fighting at different locations of mines under kathara
Supplying and laying of 3 g.i pipe medium class and day to day dismantling /laying/fitting etc. 3 and 4 g.i/m.s pipe for the fire fighting at different locations of mines under kathara
Read moreLaying, erection of 8 inch pipe range 450mtrs with pump-motor, base plate installation, tanker filling point fabrication and switch-er laying at block-iv ocp departmental patch under govindpur area
Laying, erection of 8 inch pipe range 450mtrs with pump-motor, base plate installation, tanker filling point fabrication and switch-er laying at block-iv ocp departmental patch under govindpur area
Read moreFabrication and erection of light structurals and replacement of pump cum drive motor bed in different departments type - h-app-3 in causticizer plant at srp-mechanical in tnpl unit-i
Fabrication and erection of light structurals and replacement of pump cum drive motor bed in different departments type - h app-3 in causticizer plant at srp-mechanical in tnpl unit-i
Read moreof your Industry type