Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Matching Of 1 No. Motor Pump Set With Base Frame Fabrication, Followed By Supplying And Fixing A Tyre Coupling Set R 140, Base Frame Foot Bolts, Fabrication Fitting Of Suction And Delivery Rings, Nipples, To Ready For Stand By Used For Colony And Min
|
| Description |
Matching Of 1 No. Motor Pump Set With Base Frame Fabrication, Followed By Supplying And Fixing A Tyre Coupling Set R 140, Base Frame Foot Bolts, Fabrication Fitting Of Suction And Delivery Rings, Nipples, To Ready For Stand By Used For Colony And Min
|
| Organisation | Central Coalfields Limited | Hazaribag |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | 3500 |
| Tender Value | 2.81 Lakh |
| Place | |
| Link | Login to view |
| Start Date | October 17, 2026 20:30 |
| End Date |
Open
29/10/2026
11 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Fabrication, galvanizing, testing, supply and delivery of different substation structures and matching g.i bolts, nuts and washers for augmentation of 220/132/33 kv transformer capacity from (3x160) mva to (4x160)mva along with construction of 1 no.
Fabrication, galvanizing, testing, supply and delivery of different substation structures and matching g.i bolts, nuts and washers for augmentation of 220/132/33 kv transformer capacity from (3x160) mva to (4x160)mva along with construction of 1 no.
Read moreMechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.
Mechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.
Read moreMatching a motor pump (01 unit) with base frame fabrication or modification, followed by the supply and installation of a r-140 tyre coupling set, base frame foot bolts, and the fabrication and fitting of suction and delivery nipplesin order to i
Matching a motor pump (01 unit) with base frame fabrication or modification, followed by the supply and installation of a r-140 tyre coupling set, base frame foot bolts, and the fabrication and fitting of suction and delivery nipplesin order to i
Read moreMatching of 01 nos. motor pump with base frame fabrication/modification followed by supplying and fixing tyre coupling r-140, base frame foot bolt, suction and delivery nipple fabrication and fitting to install additional pump at face sump
Matching of 01 nos. motor pump with base frame fabrication/modification followed by supplying and fixing tyre coupling r-140, base frame foot bolt, suction and delivery nipple fabrication and fitting to install additional pump at face sump
Read moreMatching of 01 nos. motor pump with base frame fabrication/modification followed by supplying and fixing tyre coupling r-140, base frame foot bolt, suction and delivery nipple fabrication and fitting to install additional pump at main sump
Matching of 01 nos. motor pump with base frame fabrication/modification followed by supplying and fixing tyre coupling r-140, base frame foot bolt, suction and delivery nipple fabrication and fitting to install additional pump at main sump
Read moreMatching of 02 nos. motor pump with base frame fabrication/modification followed by supplying and fixing tire coupling r-140, base frame foot bolt, suction and delivery nipple fabrication n fitting to install additional pump at main sump for
Matching of 02 nos. motor pump with base frame fabrication/modification followed by supplying and fixing tire coupling r-140, base frame foot bolt, suction and delivery nipple fabrication n fitting to install additional pump at main sump for
Read moreRepairing and fabrication of base frames and suction nipples
Repairing and fabrication of a two nos of pump base frame, two nos of direct haulage base frame and 5 inch and 6 inch suction nipples
Read moreFabrication of base frame for matching of new cummins ktta 19 c engine with flowmore pump.
Fabrication of base frame for matching of new cummins ktta 19 c engine with flowmore pump.
Read moreRepairing / fabrication of two (2) nos. of pump base frame, two (2) nos. of rana tugger haulage base frame and fabrication of 4 bend and 6 inches nipples at dhori (k) colliery.
Repairing / fabrication of two (2) nos. of pump base frame, two (2) nos. of rana tugger haulage base frame and fabrication of 4 bend and 6 inches nipples at dhori (k) colliery.
Read moreof your Industry type