Tender Details

Particulars Details
Title
Fabrication And Installation Of Nipple Suction Matching, Moving Flange, Welding In Bend For Dewatering Of Water From Mine With Running Pumps Of Topa Ro Ocp (A) Under Kuju Area
Description
Fabrication And Installation Of Nipple Suction Matching, Moving Flange, Welding In Bend For Dewatering Of Water From Mine With Running Pumps Of Topa Ro Ocp (A) Under Kuju Area
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_333830_1
Reference
Number
GM (K)/EnM/eTender/25-26/04
Tender Fee 0
EMD 6500
Tender Value
Place GM UNIT KUJU
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=346059
Start Date April 08, 2025 00:25
End Date

17/04/2025 ( Expired 25 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Dismantling, laying and joining of 8 diameter and 6 diameter pipeline with accessories like flange welding, rubber ion ,bend ,sluice valve and nrv etc for dewatering of different quarry for monsoon preparation 2025-26 of govindpur ph-ii ocp

Dismantling, laying and joining of 8 diameter and 6 diameter pipeline with accessories like flange welding, rubber ion ,bend ,sluice valve and nrv etc for dewatering of different quarry for monsoon preparation 2025-26 of govindpur ph-ii ocp

Read more
Transport of material like roof bolts with nuts and bearing plates ,w- straps resin capsule, stemming material , stone dust from surface to all running districts in ug panel of l.w.s at chhatarpur mine no.1, pathakhera area, wcl

Transport of material like roof bolts with nuts and bearing plates ,w- straps resin capsule, stemming material , stone dust from surface to all running districts in ug panel of l.w.s at chhatarpur mine no.1, pathakhera area, wcl

Read more
Power re-organization with bunch cable, installation of mccb and repair and maintenance of 02 nos. fog cannon along with control panel at kuju new siding of topa project under kuju area.

Power re-organization with bunch cable, installation of mccb and repair and maintenance of 02 nos. fog cannon along with control panel at kuju new siding of topa project under kuju area.

Read more
Repairing/modification of bed plate, fabrication of suction bend, delivery bend, foot valve bend, installation of pump motor (6000 gpm) at borira mines, docp under c.v. ara for dewatering of mines water.

Repairing/modification of bed plate, fabrication of suction bend, delivery bend, foot valve bend, installation of pump motor (6000 gpm) at borira mines, docp under c.v. ara for dewatering of mines water.

Read more
Dismantling, erection and extn of 6.6kv/3.3kv, 440v/230v oh line in mine supplying power to hemms, mine dewatering pumps and lighting installations and maintenance of 6.6kv, 3.3kv and 440v/230v oh line for one year on as and when req under kdh ocp

Dismantling, erection and extn of 6.6kv/3.3kv, 440v/230v oh line in mine supplying power to hemms, mine dewatering pumps and lighting installations and maintenance of 6.6kv, 3.3kv and 440v/230v oh line for one year on as and when req under kdh ocp

Read more
Repair and maintenance of infrastructure assets in r-ii division during 2024-25. sh - providing and fixing hdpe pipe to connect existing sump well with dewatering pumps to drain out storm water from golf links

Repair and maintenance of infrastructure assets in r-ii division during 2024-25.&amp#x0d sh - providing and fixing hdpe pipe to connect existing sump well with dewatering pumps to drain out storm water from golf links&amp#x0d

Read more
Repairing of 02no. 3.3kv dol er, 150a, installed for controlling of 1000gpm and 2000gpm pumps operation for dewatring purpose from mine of topa project under kuju area

Repairing of 02no. 3.3kv dol er, 150a, installed for controlling of 1000gpm and 2000gpm pumps operation for dewatring purpose from mine of topa project under kuju area

Read more
Lowering and lifting and installation of pump with alignment of pipe 150mm and 200mm dia ms/gi pipeline at karma ocp under kuju area.

Lowering and lifting and installation of pump with alignment of pipe 150mm and 200mm dia ms/gi pipeline at karma ocp under kuju area.

Read more
Providing earthing and earth continuity alog with ci clamping from ohl to all electrical equipements of topa project under kuju area.

Providing earthing and earth continuity alog with ci clamping from ohl to all electrical equipements of topa project under kuju area.

Read more
Pump shifitng, lowering and installation of 150mm and 200 mm dia ms/gi pipeline works at topa ocp mine under kuju area.

Pump shifitng, lowering and installation of 150mm and 200 mm dia ms/gi pipeline works at topa ocp mine under kuju area.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise