Tender Details
This tender closed on 11 Dec 2024. 2 tenders like it are open now.
| Particulars | Details |
|---|---|
| Title |
Matching Of 01 Nos. Motor Pump With Base Frame Fabrication/Modification Followed By Supplying And Fixing Tyre Coupling R 140, Base Frame Foot Bolt, Suction And Delivery Nipple Fabrication And Fitting To Install Additional Pump At Main Sump
|
| Description |
Matching Of 01 Nos. Motor Pump With Base Frame Fabrication/Modification Followed By Supplying And Fixing Tyre Coupling R 140, Base Frame Foot Bolt, Suction And Delivery Nipple Fabrication And Fitting To Install Additional Pump At Main Sump
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_322480_1 |
|
Reference Number |
PO/PEOCP/EnM/Tender/24-25/27 |
| Tender Fee | 0 |
| EMD | 3800 |
| Tender Value | - |
| Place | PEOCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=334273 |
| Start Date | December 02, 2024 20:30 |
| End Date |
Expired
11/12/2024
Expired 699 days ago |
Bidding on tenders like this?
Partners, bid preparation, supplier quotes and GeM registration, from our team and partners.
Get alerts for tenders like this
This one has closed. Tell us what you supply and we'll send you new tenders like it.
Free tender checklists for your industry →Open tenders like this
-
(a) annual maintenance contract (amc) for laying/dismantling/repairing damaged pipelines (6 inch, 8 inch and 10 inch dia) (b) matching of one no. motor pump set with base frame fabrication followed by supplying and fixing tyre coupling set r-140
Central Coalfields Limited | Hazaribag · Jharkhand Closes 21/11/2026
View tender -
Ktps-v-cam-inspection and removal of accumulated silt and debris from the sump bottom to ensure proper seating of stop log gates insertion of stop log gates followed by dewatering of the sump prior to strainer removal for cwp 10a and cwp 10b at cwph. the work shall include lifting of the stop log gates after completion removal inspection cleaning buffing painting and reinstallation of the suction strainers including all associated leads and lifts complete in all respects as directed by the fiel
TELANGANA POWER GENERATION CORPORATION LIMITED-CE KTPS V & VI STAGE · Telangana Closes 12/11/2026
View tender -
Matching of 01 nos. motor pump with base frame fabrication/modification followed by supplying and fixing tyre coupling r-140, base frame foot bolt, suction and delivery nipple fabrication and fitting to install additional pump at face sump
Central Coalfields Limited | Public Sector Undertakings · PEOCP Closed 06/11/2024
View tender -
Matching of 02 nos. motor pump with base frame fabrication/modification followed by supplying and fixing tire coupling r-140, base frame foot bolt, suction and delivery nipple fabrication n fitting to install additional pump at main sump for
Central Coalfields Limited | Public Sector Undertakings · Tapin North OCP Closed 25/02/2025
View tender -
Installation of 2000 gpm pump- motor with base frame, fabrication modification followed by supplying and fixing tire coupling r-140, base frame foot bolt, suction and delivery nipple fabrication fitting to install additional pump at main sump
Central Coalfields Limited | Public Sector Undertakings · Tapin North OCP Closed 10/03/2025
View tender -
Matching a motor pump (01 unit) with base frame fabrication or modification, followed by the supply and installation of a r-140 tyre coupling set, base frame foot bolts, and the fabrication and fitting of suction and delivery nipplesin order to i
Central Coalfields Limited | Public Sector Undertakings · JOCP Closed 20/12/2024
View tender -
Matching of 1 no. motor pump set with base frame fabrication, followed by supplying and fixing a tyre coupling set r-140, base frame foot bolts, fabrication fitting of suction and delivery rings, nipples, to ready for stand by used for colony and min
Central Coalfields Limited Closed 04/11/2026
View tender -
Matching of 1 no. motor pump set with base frame fabrication, followed by supplying and fixing a tyre coupling set r-140, base frame foot bolts, fabrication fitting of suction and delivery rings, nipples, to ready for stand by used for colony and min
Central Coalfields Limited | Hazaribag · Jharkhand Closed 29/10/2026
View tender -
Repairing and fabrication of base frames and suction nipples
Repairing and fabrication of a two nos of pump base frame, two nos of direct haulage base frame and 5 inch and 6 inch suction nipples
Central Coalfields Limited | Public Sector Undertakings · PE EnM dhori khas Closed 22/08/2025
View tender -
Fabrication and installation of nipple suction matching, moving flange, welding in bend for dewatering of water from mine with running pumps of topa ro-ocp (a) under kuju area
Central Coalfields Limited | Public Sector Undertakings · GM UNIT KUJU Closed 17/04/2025
View tender