Tender Details

About Tender

🏗️ Construction Opportunity: 2 Lane Rob At Prayagraj 🚧 The Ministry Of Railways, Under The Central Government, Invites Tenders For The Construction Of A 2 Lane Road Over Bridge (Rob) At Km 771/1 3 In The Ddu Pryj Section Of The Prayagraj Division, North Central Railway. 🗺️ 📅 Tender Submission Deadline: July 12, 2024, 2:30 Pm The Project Aims To Replace An Existing Level Crossing With A Modern Rob, Enhancing Road Rail Safety And Traffic Flow. Interested Contractors Must Submit A Tender Security Of Inr 23,30,200 And Adhere To The Detailed Tender Documents For Complete Project Specifications. Keywords: Construction, Rob, Ministry Of Railways, Prayagraj, North Central Railway, Level Crossing, Tender, Infrastructure Development
Particulars Details
Title
Construction Of 2 Lane Rob (End To End Including Approaches) In Lieu Of Level Crossing No. 18 At Km 771/1 3 In Ddu Pryj Section In Prayagraj Division Of North Central Railway.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 2024_NANBR_991043_1
Reference
Number
2024-10
Tender Fee 0
EMD 23.3 Lakh
Tender Value -
Place Allahabad
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/072024/74398844/viewNitPdf_4524406.pdf

Start Date June 20, 2024 23:37
End Date
Expired 12/07/2024

Expired 826 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.

Construction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.

Read more
Electrification work of rob at crossing 415a/2e, in between naribari-shivrajpur road near sankargarh railway station in distt prayagraj

Electrification work of rob at crossing 415a/2e, in between naribari-shivrajpur road near sankargarh railway station in distt prayagraj

Read more
Construction of rob in lieu of level crossing no. 229 at km 1324/16-18 in between rpgu-bnar stations in vglj-cnb section & construction of rob in lieu of level crossing no. 367 at km 1126/20-22 at jhansi yard in bina-vglj section in jhansi division of north central railway.

Construction of rob in lieu of level crossing no. 229 at km 1324/16-18 in between rpgu-bnar stations in vglj-cnb section & construction of rob in lieu of level crossing no. 367 at km 1126/20-22 at jhansi yard in bina-vglj section in jhansi division of north central railway.

Read more
Sr (special repair) work providing safety railing on 2-lane rob and its approaches in lieu of existing level crossing (lc no. c-61) at km 165.550 on nh-89 in nagaur city

Sr (special repair) work providing safety railing on 2-lane rob and its approaches in lieu of existing level crossing (lc no. c-61) at km 165.550 on nh-89 in nagaur city

Read more
Construction of 2 lane rob including approaches in lieu of lc no.29-c at km 47/19-21 between sonik-unnao section in lucknow division on northern railway under dy. ce/c-iv/lucknow on northern railway.

Construction of 2 lane rob including approaches in lieu of lc no.29-c at km 47/19-21 between sonik-unnao section in lucknow division on northern railway under dy. ce/c-iv/lucknow on northern railway.

Read more
Construction of road over bridge (full rob) in lieu of level crossing no. am -34 at km -323/14-15 between jamadoba -bhaga station under adra division, road over bridge (only approach portion) in lieu of level crossing no. 239 at rly. km. 149/29-31 between railway station tangarmunda-dharuadihi at bamra railway station yard under chakradharpur division , road over bridge (only approach portion) in lieu of level crossing no. 256 at rly. km. 510/12-14 between railway station dhutra-jharsuguda in

Construction of road over bridge (full rob) in lieu of level crossing no. am -34 at km -323/14-15 between jamadoba -bhaga station under adra division, road over bridge (only approach portion) in lieu of level crossing no. 239 at rly. km. 149/29-31 between railway station tangarmunda-dharuadihi at bamra railway station yard under chakradharpur division , road over bridge (only approach portion) in lieu of level crossing no. 256 at rly. km. 510/12-14 between railway station dhutra-jharsuguda in

Read more
Construction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway

Construction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway

Read more
Carrying out site survey, geo-technical investigation, preparation of preliminary alignment design and general arrangement drawing (gad) for construction of road over bridge (rob) in lieu of 12 nos. level crossing (lc) gate over konkan railway.

Carrying out site survey, geo-technical investigation, preparation of preliminary alignment design and general arrangement drawing (gad) for construction of road over bridge (rob) in lieu of 12 nos. level crossing (lc) gate over konkan railway.

Read more
25 kv ohe modification work due to provision of advance trip maintenance centre at electric trip shed pryj in prayagraj division of n c railway.

25 kv ohe modification work due to provision of advance trip maintenance centre at electric trip shed pryj in prayagraj division of n c railway.

Read more
Construction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work

Construction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise