Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 3 Nos Vertical Chamber At Sodepur Sansad Area
|
| Description |
Construction Of 3 Nos Vertical Chamber At Sodepur Sansad Area
|
| Organisation | Zilla Parishad | State Govt. and UT |
| Tender Id | 2024_ZPHD_636496_3 |
|
Reference Number |
- |
| Tender Fee | 250 |
| EMD | 2440 |
| Tender Value | - |
| Place | PASCHIM GOPINATHPUR GP OFFICE |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1366128 |
| Start Date | January 03, 2024 20:00 |
| End Date |
Expired
18/01/2024
Expired 978 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreDevelopment of parks (2 nos) by construction of compound wall, open gym equipments and painting at vidya maruthi colony in ward-17 cherlapally, kapra circle-07, mmc.(rs.49.00 lakhs)
Development of parks (2 nos) by construction of compound wall, open gym equipments and painting at vidya maruthi colony in ward-17 cherlapally, kapra circle-07, mmc.(rs.49.00 lakhs)
Read moreConstruction of hard park of m.t.e. at drmu, barauni dairy
Construction of hard park of m.t.e. at drmu, barauni dairy
Read moreHiring of 4.6 cum front end loader on hourly basis for handling coal with 24 hours availability for a period of 3 years with a minimum working hours of 350 hours per month at rchp, kgm area
Hiring of 4.6 cum front end loader on hourly basis for handling coal with 24 hours availability for a period of 3 years with a minimum working hours of 350 hours per month at rchp, kgm area
Read moreConstruction of bridge / hlb on i) allapur to arutla x-road (via) thumbai thanda, kadilabavi thanda at km 1/6-8, km 3/8-10, km 6/4-6, ii) gudi malkapur to chelmada (via) kothulapuram, survail, lingamvari gudem, saigoni bavi at km 3/4-6, km 4/0-2, km 4/4-6, km 5/6-8, km 7/8-10, km 9/0-2, km 9/2-4, km 10/8-10, km 11/2-4, km 12/2-4, iii) lachammagudem to anthampet at km 2/8-10, survail to palivela (via) mallareddy gudem at km 6/2-4, km 7/0-2, km 7/4-6, km 8/8-10 (2 nos), km 11/0-2, km 11/6-8, iv) n
Construction of bridge / hlb on i) allapur to arutla x-road (via) thumbai thanda, kadilabavi thanda at km 1/6-8, km 3/8-10, km 6/4-6, ii) gudi malkapur to chelmada (via) kothulapuram, survail, lingamvari gudem, saigoni bavi at km 3/4-6, km 4/0-2, km 4/4-6, km 5/6-8, km 7/8-10, km 9/0-2, km 9/2-4, km 10/8-10, km 11/2-4, km 12/2-4, iii) lachammagudem to anthampet at km 2/8-10, survail to palivela (via) mallareddy gudem at km 6/2-4, km 7/0-2, km 7/4-6, km 8/8-10 (2 nos), km 11/0-2, km 11/6-8, iv) nh-65 to narayanpur (via) koyalagudem, d.nagaram, peepalpahad, allapur, venkambai thanda at km 3/0-2, km 3/8-10, km 8/2-4, km 10/2-4, km 11/0-2, km 16/0-2 in yadadri-bhongir district.
Read moreConstruction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Read moreDevelopment of park by construction of compound wall, open gym equipments and painting at venkat reddy nagar in ward-17 cherlapally, kapra circle-07, mmc.(rs.43.00 lakhs)
Development of park by construction of compound wall, open gym equipments and painting at venkat reddy nagar in ward-17 cherlapally, kapra circle-07, mmc.(rs.43.00 lakhs)
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreDevelopment of park by construction of compound wall, children play equipments and painting at vr colony and sai reddy colony, chinna cherlapally in ward-17 cherlapally, kapra circle-07, mmc.(rs.42.00 lakhs)
Development of park by construction of compound wall, children play equipments and painting at vr colony and sai reddy colony, chinna cherlapally in ward-17 cherlapally, kapra circle-07, mmc.(rs.42.00 lakhs)
Read moreConstruction of 3 nos vertical chamber at paschim gopinathpur sansad area
Construction of 3 nos vertical chamber at paschim gopinathpur sansad area
Read moreof your Industry type