Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pannel Radiator For Tawang Circle,Boiler For Tawang Circle,Coolent Anti Freeze Supply Of Anti Freez
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/R/298639 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | February 03, 2024 05:30 |
| End Date |
Expired
06/02/2024
Expired 982 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
DEVNAM PIYADASSI BRIXWELL PRIVATE LIMITEDVinayak EnterprisesDD ENTERPRISESOFFICE...
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | BHARAT TRADING CORPORATION(MSE,MII) | Item Categories : Pannel Radiator for Tawang Circle,Boiler for Tawang Circle,Coolent anti freeze Supply of anti freez | 814351.00 | L1 |
| 2 | EUROTHERM INDIA (MSE,MII) | Item Categories : Pannel Radiator for Tawang Circle,Boiler for Tawang Circle,Coolent anti freeze Supply of anti freez | 815551.00 | L2 |
| 3 | LAXMI INDUSTRIES (MSE,MII) | Item Categories : Pannel Radiator for Tawang Circle,Boiler for Tawang Circle,Coolent anti freeze Supply of anti freez | 869151.00 (Bid Price) | L3 |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| Crompton Briz Air Deco 1200mm Lustre Brown | crompton | Crompton Briz Air Deco 1200mm Lustre Brown | 12 | ₹ 28800.000 |
| NOTICE BOARD | NA | NA | 4 | ₹ 4600.000 |
| Samsung MLT-D203S Black Toner Cartridge | SAMSUNG | Samsung MLT-D203S Black Toner Cartridge | 60 | ₹ 333600.000 |
| file cover with printing | AU | file cover with printing | 300 | ₹ 3000.000 |
| SIMMTRONICS 2GB | Simmtronics | SIMMTRONICS 2GB DDR2 | 14 | ₹ 14000.000 |
| File Tag Green | Unbranded | File Tag Green-v18 | 372 | ₹ 49848.000 |
| Microsoft Officestd 2016 SNGL OLP C | Microsoft | Microsoft & Officestd 2016 SNGL OLP C | 1 | ₹ 14800.000 |
| Electrical Wire 4mm Bundle 90M | finolex | 4m-CU-AL | 6 | ₹ 37800.000 |
| SURF EXCEL EASY WASH | surf excel | SURF EXCEL BLUE | 15 | ₹ 1638.750 |
| MULTIMEDIA PROJECTOR | Hitachi | HITACHI CP-X2542WN | 1 | ₹ 37280.000 |
| hp desktop | hp | HP Slimline 270-p020il | 2 | ₹ 64798.000 |
| GODREJ COMPUTER TABKE C11 | GODREJ INTERIO | GODREJ COMPUTER TABKE C11 | 2 | ₹ 17560.000 |
| CDMA Trainer | Tatame | Tatame TTCDMATR | 1 | ₹ 49990.000 |
| MEDICAL REIMBURSEMENT CLAIM FORM | PARAS | PARAS MEDICAL REIMBURSEMENT CLAIM FORM | 10 | ₹ 950.000 |
| best and more reliable weighing scale | Omron | hn289 omron | 25 | ₹ 49999.750 |
| Carrier split AC | Carrier | CAS18DF3N8F0/2018 | 1 | ₹ 37850.000 |
| File wrapper or flap | NA | wrapper | 600 | ₹ 2580.000 |
| file cabinet four drawer (NV) | N.V. | NV-FC-001 | 1 | ₹ 8900.100 |
| HP 204A Cyan LaserJet Toner Cartridge CF511A | hp | HP 204A Cyan LaserJet Toner Cartridge CF511A | 2 | ₹ 6986.000 |
| HP 204A Yellow LaserJet Toner Cartridge CF512A | hp | HP 204A Yellow LaserJet Toner Cartridge CF512A | 2 | ₹ 6986.000 |
Repair and overhauling of engine, coolent pump radiator of 62.5 kva dg set for smooth functioning at cgra gopalpur under ge (i) (cg) bhubaneswar
Repair and overhauling of engine, coolent pump radiator of 62.5 kva dg set for smooth functioning at cgra gopalpur under ge (i) (cg) bhubaneswa
Read moreNctps i se mi circle boiler maintenance division specification no 305 25 26
Tangedco nctps i 3x210mw installation of semi dry flue gas desulphurization system
Read moreNctps i se mi circle boiler maintenance division annual overhaul work for the year 26 27 specification no 115 26 27
Nctps i semi circle aoh 2627bm dn unit i renewal of damaged acw line at 0mtr from boiler wall to mill area during annual overhaul 202627
Read moreMtps i - civil circle - replacing the damaged acc sheets with new galvalume sheets (0.8 mm) for the roof top of boiler unit i at mtps i
Mtps i - civil circle - replacing the damaged acc sheets with new galvalume sheets (0.8 mm) for the roof top of boiler unit i at mtps i
Read moreTtps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills d, e and f and boiler during the forthcoming overhaul
Ttps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills d, e and f and boiler during the forthcoming overhaul
Read moreTtps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills a, b and c and boiler during the forthcoming overhaul
Ttps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills a, b and c and boiler during the forthcoming overhaul
Read moreProcurement of chemicals are essential for carrying out anti-larval operations and vector control measures in ghatkesar circle-06 to prevent the outbreak of mosquito-borne diseases. timely procurement is necessary to ensure uninterrupted entomology activities, ghatkesar circle-06, mmc
Procurement of chemicals are essential for carrying out anti-larval operations and vector control measures in ghatkesar circle-06 to prevent the outbreak of mosquito-borne diseases. timely procurement is necessary to ensure uninterrupted entomology activities, ghatkesar circle-06, mmc
Read moreTtps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 1 and 2 during the forthcoming overhaul
Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 1 and 2 during the forthcoming overhaul
Read moreTtps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 3 and 4 during the forthcoming overhaul
Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 3 and 4 during the forthcoming overhaul
Read moreTtps es circle instn ii removing cleaning flushing, and refixing of bearing temperature heat gauges critical transmitters in boiler and turbine areas, disconnection and reconnection of power and control cables of actuators limit switches feedback
Ttps es circle instn ii removing cleaning flushing, and refixing of bearing temperature heat gauges critical transmitters in boiler and turbine areas, disconnection and reconnection of power and control cables of actuators limit switches feedback
Read moreof your Industry type